3Ware 9550SXU-16ML User Guide - Page 190

Selecting Self-tests to be Performed, Add New Slot, Schedule Self-tests, Management > Schedule

Page 190 highlights

Chapter 9. Maintaining Units 5 Click the Add New Slot button. The page refreshes and the new schedule is added to the list. Note: The scheduled tasks can be added in any order. For example a new task scheduled for Tuesday (slot-2) will preempt the task originally scheduled for Wednesday (slot-1). Selecting Self-tests to be Performed Two self-tests can be set, to check whether UDMA Mode can be upgraded, and whether SMART thresholds have been exceeded. (For more information about these self-tests, see the 3DM Reference section, "Scheduling Page" on page 96.) Initially, these tests are set to run every 24 hours. You can change the schedule for when they are run, and you can disable the tests, if you prefer not have to have them performed. Note: These tasks will only be run during scheduled times if they are checked in the Schedule Self-tests section of the Scheduling page. If neither of the tasks is checked, self-tests will never run, even if you have scheduled time slots set. To select self-tests to be performed 1 Choose Management > Schedule from the menu bar. The Scheduling Page appears, showing the schedule for Rebuild Tasks. 2 Select Self-test Tasks from the drop-down list at the top of the page. 3 Check the boxes next to the self-tests you want to be performed. To disable self-tests Unlike scheduling of rebuilds and verifies, scheduling of self-tests is always enabled. To disable self-tests you must either remove all schedule times, or uncheck the tests listed in the Tasks column. 180 3ware 9550SX Serial ATA RAID Controller User Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256
  • 257
  • 258
  • 259
  • 260

Chapter 9. Maintaining Units
180
3ware 9550SX Serial ATA RAID Controller User Guide
5
Click the
Add New Slot
button.
The page refreshes and the new schedule is added to the list.
Note:
The scheduled tasks can be added in any order. For example
a new task scheduled for Tuesday (slot-2) will preempt the task
originally scheduled for Wednesday (slot-1).
Selecting Self-tests to be Performed
Two self-tests can be set, to check whether UDMA Mode can be upgraded,
and whether SMART thresholds have been exceeded. (For more information
about these self-tests, see the 3DM Reference section, “Scheduling Page” on
page 96.)
Initially, these tests are set to run every 24 hours. You can change the schedule
for when they are run, and you can disable the tests, if you prefer not have to
have them performed.
Note:
These tasks will only be run during scheduled times if they
are checked in the
Schedule Self-tests
section of the Scheduling
page. If neither of the tasks is checked, self-tests will never run,
even if you have scheduled time slots set.
To select self-tests to be performed
1
Choose
Management > Schedule
from the menu bar.
The Scheduling Page appears, showing the schedule for Rebuild Tasks.
2
Select Self-test Tasks from the drop-down list at the top of the page.
3
Check the boxes next to the self-tests you want to be performed.
To disable self-tests
Unlike scheduling of rebuilds and verifies, scheduling of self-tests is always
enabled.
To disable self-tests you must either remove all schedule times, or uncheck
the tests listed in the
Tasks
column.