3Ware 9550SXU-16ML User Guide - Page 254
Migration paused 03Eh, Rebuild started 00Bh
UPC - 693494971606
View all 3Ware 9550SXU-16ML manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 254 highlights
Battery capacity test completed (050h) 228 Battery capacity test is overdue (053h) 229 Battery capacity test started (04Eh) 228 Battery charging completed (056h) 229 Battery charging fault (057h) 229 Battery charging started (055h) 229 Battery health check completed (52h) 228 Battery health check failed (05Dh) 230 Battery health check started (051h) 228 Battery is not present (05Bh) 229 Battery is present (05Ah) 229 Battery is weak (05Ch) 229 Battery temperature is high (04Bh) 227 Battery temperature is low (04Ah) 227 Battery temperature is normal (049h) 227 Battery temperature is too high (04Dh) 228 Battery temperature is too low (04Ch) 227 Battery voltage is high (046h) 226 Battery voltage is low (045h) 226 Battery voltage is normal (044h) 226 Battery voltage is too high (048h) 227 Battery voltage is too low (047h) 227 Buffer ECC error corrected(039h) 225 Buffer integrity test failed (024h) 221 Cache flush failed 221 Cache synchronization completed (05Eh) 230 Cache synchronization failed 230 Cache synchronization skipped (04Fh) 228 Controller error occurred (003h) 217 Controller reset occurred (001h) 217 DCB checksum error detected(027h) 222 DCB version unsupported (028h) 222 Degraded unit (002h) 217 Downgrade UDMA (021h) 220 Drive ECC error reported (026h) 222 Drive error detected (00Ah) 219 Drive not supported (030h) 224 Drive power on reset detected (03Ah) 225 Drive removed (019h) 220 Drive timeout detected (009h) 218 Flash file system error detected (03Fh) 225 Flash file system repaired (040h) 225 Incomplete unit detected (006h) 218 Initialize completed (007h) 218 Initialize failed (00Eh) 219 Initialize paused (03Ch) 225 Initialize started (00Ch) 219 Migration completed (035h) 224 Migration failed (034h) 224 Migration paused (03Eh) 225 Migration started (033h) 224 Primary DCB read error occurred (042h) 226 Rebuild completed (005h) 218 Rebuild failed (004h) 217 Rebuild paused (03Bh) 225 Rebuild started (00Bh) 219 Replacement drive capacity too small (02Eh) 223 Sector repair completed (023h) 221 SMART threshold exceeded (00Fh) 219 SO-DIMM not compatible (037h) 224 SO-DIMM not detected (038h) 224 Source drive ECC error overwritten(02Ch) 223 Source drive error occurred(02Dh) 223 Spare capacity too small for some units (032h) 224 Unclean shutdown detected (008h) 218 Unit deleted (00Dh) 219 Unit inoperable (01Eh) 220 Unit number assignments lost (041h) 226 Upgrade UDMA mode (022h) 221 Verify completed(02Bh) 223 Verify failed (02Ah) 223 Verify fixed data/parity mismatch (036h) 224 Verify not started 223 Verify paused (03Dh) 225 Verify started (029h) 222 AEN messages 107, 167, 214 AENDrive inserted (01Ah) 220 Alarms page, 3DM 107 alarms, viewing 167 array roaming 4, 154, 156 arrays 4 definition 231 moving from one controller to another 156 removing in 3DM 154 auto initialization after power failure 171 auto-carving 117, 121 Auto-Carving (setting in 3DM) 95 Auto-Rebuild 13 Auto-Rebuild (setting in 3DM) 95 Auto-Rebuild policy 123 Auto-verify setting for units (3DM) 93 available drives, 3DM 104 B background rebuild rate definition 231 background tasks about 169 background task rate in 3DM 92 background task rate, setting 175 definition 12 prioritizing 176 scheduling 176 Backup DCB read error detected (043h) 226 Battery capacity is below error level (059h) 229 Battery capacity is below warning level (058h) 229 Battery capacity test completed (050h) 228 244 3ware 9550SX Serial ATA RAID Controller User Guide