Acer H6510BD Acer Projector H6510BD, P1340W, X1140, X1240 Service Guide - Page 54

Assemble Baffle LP, Hook top of Baffle LP first Fig. 1-14 & Hook bottom of Baffle

Page 54 highlights

Push on the left corner until lock the screw well Lock the screw well Fig. 1-6 Fig. 1-7 Overfill Vertical Adjustment Screw M2, 8L Fig. 1-8 Overfill Horizontal Adjustment Screw M2, 8L For P1340W: 1.3 Assemble LP Module to HSG DMD (1) Assemble two Overfill adjustment screws (M2) to HSG DMD (Fig. 1-9). ** Adjustment criteria refer to below item 1.4 & Fig. 1-10. (2) Hook Clip LP to HSG DMD, and lock with screw well. (Fig. 1-11). (3) Press CLIP of BKT LP first and push it into the hole (Fig. 1-12). (4) Place LP Module on LP datum of "DMD HSG" and adjustment screw well (Fig. 1-13). (5) Assemble "Baffle LP", Hook top of Baffle LP first (Fig. 1-14) & Hook bottom of Baffle LP to HSG DMD well (Fig. 1-15). 1.4 Overfill Adjustment LP Module Overfill Adjustment Criteria: (1) Pre-assemble 2 adjusting screws. Criteria as Fig.1-12 (2) Alignment Sequence: a. To adjust "Horizontal Adjustment Screw" firstly, and then "Vertical Adjustment Screw". 54

We apologize, but we cannot currently deliver this PDF manual by request of the manufacturer.

We apologize for any inconveniece.