Acer H6510BD Acer Projector H6510BD, P1340W, X1140, X1240 Service Guide - Page 57

djustment screws M2 to HSG DMD Fig

Page 57 highlights

For H6510BD: 1.5 Assembly LP Module to HSG DMD (1) Assembly two Overfill adjustment screws (M2) to HSG DMD (Fig. 1-16). ** Adjustment criteria refer to below item 1.6 & Fig. 1-17. (2) Press CLIP of BKT LP first and push it into the hole (Fig. 1-18). (3) Hook Clip LP to HSG DMD, and lock with screw well. (Fig. 1-19). (4) Placed LP Module on LP datum of "DMD HSG" and adjustment screw well, shown (Fig. 1-20). (5) Assembly "Baffle LP", Hook top of Baffle LP first (Fig. 1-21) & screws (M2) well (Fig. 1-22). 1.6 Overfill Adjustment @ LP Module Overfill Adjustment Criteria: (1) Pre-assembly 2 adjusting screws. Criteria shown as Fig.1-16 (2) Alignment Sequence: a. To adjust "Horizontal Adjustment Screw" firstly, and then "Vertical Adjustment Screw". b. Refer to Fig. 1-16 (3) For Overfill Re-adjustment: a. Those 2 Adjustment Screws must be released closely to the "Pre-assembly" positions first (Fig. 1-19). b. Follow adjustment steps shown in Item 1.6 (2). Pre assemble this screw not over the side surface. Overfill Vertical Adjustment Screw M2 Overfill Horizontal Adjustment Screw M2 Fig. 1-16 Fig. 1-17 Pre assemble this screw not over the bottom surface 57

We apologize, but we cannot currently deliver this PDF manual by request of the manufacturer.

We apologize for any inconveniece.