Acer X221 Service Guide - Page 35

Assembly process

Page 35 highlights

Assembly process Picture Description CHECKING THE FOAM CUSHION AND PUT IT TO PRODUCTION LINE CHECKING THE PCB SHIELDING AND PUT IT TO PRODUCTION LINE STICK 2*PCS RUBBER ON THE LOCATION OF SHIELDING AS LEFT SHOW PUT 1*PCS FLOW CARD ON THE PRODUCTION LINE CHECKING THE MAIN BOARD WHETHER BAD CHECKING THE LVDS CABLE AND INSERT IT TO THE SINK OF MAIN BOARD CHECKING THE CONNECT CABLE OF BUTTON BOARD AND INSERT IT TO THE SINK OF MIAN BOARD PUT THE FINISHED SUBASSEMBLY TO THE PRODUCTION LINE

We apologize, but we cannot currently deliver this PDF manual by request of the manufacturer.

You can visit the Acer X221 on the Acer site to download this or other manuals by visiting this link.

We apologize for any inconveniece.