Acer AS5534-1121 Aspire 5534 Service Guide - Page 77

Pull the Mainboard FFC through the cover as shown.

Page 77 highlights

6. Remove the three screws securing the button board to the Upper Cover. Step Button Board M2*3 Size Quantity 3 7. Pull the Mainboard FFC through the cover as shown. IMPORTANT: Ensure that the FFC is not torn off during removal. Screw Type Chapter 3 67

We apologize, but we cannot currently deliver this PDF manual by request of the manufacturer.

We apologize for any inconveniece.