Acer Aspire 5349 Aspire 5349, 5749, 5749Z Service Guide - Page 122

Power Board Installation, Install and secure two 2 screws to the power board. Refer

Page 122 highlights

Power Board Installation 0 1. Place the power board onto the lower case and press down to secure it. Refer to Figure 3-36. 2. Install and secure two (2) screws to the power board. Refer to Figure 3-35 3. Install the mainboard. ID Size Red M2.5*3.5 Call out Quantity 2 Screw Type 3-38 Machine Maintenance Procedures

We apologize, but we cannot currently deliver this PDF manual by request of the manufacturer.

We apologize for any inconveniece.