Bosch SHV7ER53UC Installation Instructions - Page 4

Tools and Materials Needed

Page 4 highlights

Tools and Materials Needed Hammer Hole Saw Pipe Wrench Adjustable Wrench Tape Measure Slot Screwdriver Phillips Screwdriver Torx T-20 Screwdriver Wire Cutter Wire Stripper Ø 2 mm (1/16 in) Drill Level Electrical Supply Cable - Minimum #14 AWG, 2 conductor, 1 ground, insulated copper conductors rated 75°C or higher Hot Water Supply Line - Minimum 3/8″ O.D. copper tubing or metal braided dishwasher supply line Shut-off valve and fittings appropriate for hot water supply line (copper tubing/compression fitting, or braided hose) UL listed conduit connector or strain relief is required if you attach the field wiring directly to the terminal block 4 4

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38

Electrical Supply Cable
- Minimum #14 AWG, 2 conductor, 1
ground, insulated copper conductors rated 75°C or higher
Hot Water Supply Line - Minimum
3
/
8
″ O.D. copper tubing or metal
braided dishwasher supply line
Shut-off valve and fittings appropriate for hot water supply line
(copper tubing/compression fitting, or braided hose)
UL listed conduit connector or strain relief is required if you attach
the field wiring directly to the terminal block
Hammer
Hole Saw
Pipe Wrench
Tape Measure
Slot Screwdriver
Phillips Screwdriver
Torx T-20 Screwdriver
Wire Cutter
Wire Stripper
Ø 2 mm (
1
/
16
in) Drill
Level
Adjustable Wrench
Tools and Materials Needed
4