Cisco 3825 User Guide - Page 96
Front Panel LED Status Indicator Functions, Initial Power Up, Calibration - ac ip
UPC - 746320981505
View all Cisco 3825 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 96 highlights
Front Panel LED Status Indicator Functions Front Panel LED Status Indicator Functions Initial Power Up, Calibration, and Registration (AC Power applied) The following chart illustrates the sequence of steps and the corresponding appearance of the residential gateway front panel LED status indicators during power up, calibration, and registration on the network when AC power is applied to the residential gateway. Use this chart to troubleshoot the power up, calibration, and registration process of your residential gateway. Note: After the residential gateway completes Step 6 (Request High-Speed Data Provisioning File), the modem proceeds immediately to Normal Operations. See Normal Operations (AC Power applied) (on page 98). Front Panel LED Status Indicators During Initial Power Up, Calibration, and Registration High Speed Data Registration Step: 1 Front Panel Indicator Self Test 1 POWER On 2 DS On 3 US On 4 ONLINE On 5 ETHERNET1-4 On 6 USB On 7 WIRELESS Off LINK 8 WIRELESS Off SETUP 2 Downstream Scan 3 Downstream Signal Lock 4 Ranging On Blinking Off Off On or Blinking On or Blinking On or Blinking On or Blinking On On Off Off On or Blinking On or Blinking On or Blinking On or Blinking On On Blinking Off On or Blinking On or Blinking On or Blinking On or Blinking 5 Requesting IP Address On On On Off On or Blinking 6 Request High Speed Data Provisioning File On On On Blinking On or Blinking On or Blinking On or Blinking On or Blinking On or Blinking On or Blinking On or Blinking 96 4021196 Rev A