Powering Considerations

Page 73 highlights

Chapter 3 Switch Installation Planning the Stack Powering Considerations Consider the following guidelines before you power the switches in a stack: • The sequence in which the switches are initially powered on might affect the switch that becomes the stack master. • If you want a particular switch to become the stack master, power on that switch first. This switch becomes the stack master and remains the stack master until a master re-election is required. After approximately 10 seconds power on the remaining switches in the stack. • If you have no preference as to which switch becomes the stack master, power on the all the switches in the stack within a 10-second timeframe. These switches participate in the stack master election. Switches powered on after the 10-second timeframe do not participate in the election. • Power off a switch before you add it to or remove it from an existing switch stack. Note For conditions that can cause a stack master re-election or to manually elect the stack master, refer to the "Managing Switch Stacks" chapter in the switch software configuration guide. 78-15136-02 Catalyst 3750 Switch Hardware Installation Guide 3-13

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198

3-13
Catalyst 3750 Switch Hardware Installation Guide
78-15136-02
Chapter 3
Switch Installation
Planning the Stack
Powering Considerations
Consider the following guidelines before you power the switches in a stack:
The sequence in which the switches are initially powered on might affect the
switch that becomes the stack master.
If you want a particular switch to become the stack master, power on that
switch first. This switch becomes the stack master and remains the stack
master until a master re-election is required. After approximately 10 seconds
power on the remaining switches in the stack.
If you have no preference as to which switch becomes the stack master, power
on the all the switches in the stack within a 10-second timeframe. These
switches participate in the stack master election. Switches powered on after
the 10-second timeframe do not participate in the election.
Power off a switch before you add it to or remove it from an existing switch
stack.
Note
For conditions that can cause a stack master re-election or to manually elect the
stack master, refer to the
Managing Switch Stacks
chapter in the switch
software configuration guide.