Cub Cadet 524 SWE Two-Stage Snow Thrower 524 WE Operator's Manual - Page 7
Assembly & Set-Up - snow thrower parts
View all Cub Cadet 524 SWE Two-Stage Snow Thrower manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 7 highlights
Assembly & Set-Up 3 Contents of Carton • One Snow Thrower • One Chute Control Rod • One Snow Thrower Operator's Manual • Two Replacement Auger Shear Pins • One Chute Assembly • One Product Registration Card • One Engine Operator's Manual Assembly Remove all loose parts before assembling. Handle Assembly 1. Place the shift lever in the Forward-6 position 2. Observe the lower rear area of the snow thrower to be sure both cables are aligned with roller guides before pivoting the handle upward. Pivot the handle upward. See Figure 3-1. Figure 3-2 Chute Assembly 1. Remove hairpin clip, wing nut and hex screw from chute control head and clevis pin and bow-tie cotter pin from chute support bracket. See Figure 3-3. Figure 3-1 NOTE: Make certain the cables are seated properly in the roller guides. See Figure 3-2. 3. Secure the handle by tightening the plastic knob located on both the left and right sides of the handle. Remove and discard any rubber bands, if present. They are for packaging purposes only. Chute Chute Control Head Chute Support Bracket Chute Base Figure 3-3 7