D-Link DES-1050G User Manual - Page 12

Installation - user guide

Page 12 highlights

D-Link DES-1050G Unmanaged Layer 2 Ethernet Switch Installation SECTION 2 Package Contents Before You Connect to the Network Installing the Switch Without the Rack Rack Installation Power On Package Contents Open the shipping carton of the Switch and carefully unpack its contents. The carton should contain the following items: • One DES-1050G Stand-alone Switch • One AC power cord • This User's Guide on CD-ROM • Registration Card • Mounting Kit (two brackets and screws) • Four rubber feet with adhesive backing If any item is found missing or damaged, please contact your local D-Link reseller for replacement. Before You Connect to the Network The site where you install the Switch may greatly affect its performance. Please follow these guidelines for setting up the Switch. • Install the Switch on a sturdy, level surface that can support at least 4 kg of weight. Do not place heavy objects on the Switch. • The power outlet should be within 1.82 meters (6 feet) of the Switch. • Visually inspect the power cord and see that it is fully secured to the AC power port. • Make sure that there is proper heat dissipation from and adequate ventilation around the switch. Leave at least 10 cm of space at the front and rear of the Switch for ventilation. • Install the Switch in a fairly cool and dry place for the acceptable temperature and humidity operating ranges. • Install the Switch in a site free from strong electromagnetic field generators (such as motors), vibration, dust, and direct exposure to sunlight. • When installing the switch on a level surface, attach the rubber feet to the bottom of the device. The rubber feet cushion the Switch, protect the casing from scratches and prevent it from scratching other surfaces. 5

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35

D-Link DES-1050G Unmanaged Layer 2 Ethernet Switch
SECTION 2
Installation
Package Contents
Before You Connect to the Network
Installing the Switch Without the Rack
Rack Installation
Power On
Package Contents
Open the shipping carton of the Switch and carefully unpack its contents. The carton should contain the
following items:
One DES-1050G Stand-alone Switch
One AC power cord
This User’s Guide on CD-ROM
Registration Card
Mounting Kit (two brackets and screws)
Four rubber feet with adhesive backing
If any item is found missing or damaged, please contact your local D-Link reseller for replacement.
Before You Connect to the Network
The site where you install the Switch may greatly affect its performance. Please follow these guidelines for
setting up the Switch.
Install the Switch on a sturdy, level surface that can support at least 4 kg of weight. Do not place heavy
objects on the Switch.
The power outlet should be within 1.82 meters (6 feet) of the Switch.
Visually inspect the power cord and see that it is fully secured to the AC power port.
Make sure that there is proper heat dissipation from and adequate ventilation around the switch. Leave at
least 10 cm of space at the front and rear of the Switch for ventilation.
Install the Switch in a fairly cool and dry place for the acceptable temperature and humidity operating
ranges.
Install the Switch in a site free from strong electromagnetic field generators (such as motors), vibration,
dust, and direct exposure to sunlight.
When installing the switch on a level surface, attach the rubber feet to the bottom of the device. The
rubber feet cushion the Switch, protect the casing from scratches and prevent it from scratching other
surfaces.
5