Dell VNXe2 40U-C Cabinet Unpacking and Setup Guide

Dell VNXe2 Manual

Dell VNXe2 manual content summary:

  • Dell VNXe2 | 40U-C Cabinet Unpacking and Setup Guide - Page 1
    -001-555 REV 05 September 3, 2014 This Unpacking and Setup Guide contains information about the EMC 40U-C cabinet. Topics include: Note This document was accurate at publication time. Go to EMC Online Support (https:// support.emc.com) to ensure that you are using the latest version of this document
  • Dell VNXe2 | 40U-C Cabinet Unpacking and Setup Guide - Page 2
    . CAUTION Some EMC® products are designed for installation by trained service personnel only. Attempts by unqualified personnel to set up and start ramp kits only) on page 12. CL5427 Note The illustrations in this guide are examples only. Depending on what you ordered, your configuration may
  • Dell VNXe2 | 40U-C Cabinet Unpacking and Setup Guide - Page 3
    Unpacking and Setup Guide Hardware acclimation Systems and components must acclimate to the operating environment before Roll the cabinet down the ramp on page 7 5 Position and level the cabinet on page 9 6 GUID-FB1B6860-CF07-4A2E-972A-ABADF4CAA716 7 Install the lower rack bezel on page 11
  • Dell VNXe2 | 40U-C Cabinet Unpacking and Setup Guide - Page 4
    Step 9 Task Repackaging shipping material (2-piece ramp kits only) on page 12 Remove the ramp and shipping material from the cabinet Procedure 1. Remove any boxes and other material from the cabinet sides. CL4691 2. Do not pull a ramp down from the top. To release the ramp from the pallet, grasp
  • Dell VNXe2 | 40U-C Cabinet Unpacking and Setup Guide - Page 5
    Unpacking and Setup Guide Bracket Rear Accessory Kit Bracket Screws Rotated 90 3. Remove the plastic covering from the cabinet. EMC3552 Remove the cabinet shipping brackets Procedure 1. At the rear
  • Dell VNXe2 | 40U-C Cabinet Unpacking and Setup Guide - Page 6
    9/16-in. (14-mm) CL4831 Attach the unloading ramp Procedure 1. Insert the ramp brackets into the pallet notches in the rear of the pallet. Rear EMC2843 2. If your shipment includes a two-piece ramp, attach part A to the pallet and part B to part A. 6 40U-C Cabinet
  • Dell VNXe2 | 40U-C Cabinet Unpacking and Setup Guide - Page 7
    Unpacking and Setup Guide CL4692 Roll the cabinet down the ramp NOTICE Make certain the leveling feet are secured in the UP position before moving the cabinet. Secured feet
  • Dell VNXe2 | 40U-C Cabinet Unpacking and Setup Guide - Page 8
    WARNING The cabinet is heavy. Make certain you have sufficient help and secure footing before rolling the cabinet onto the ramp. ATTENTION! L'armoire est lourde. Assurez-vous d'obtenir l'aide d'une personne et d'avoir un point d'appui sûr avant d'installer l'armoire sur la rampe. ACHTUNG! Das
  • Dell VNXe2 | 40U-C Cabinet Unpacking and Setup Guide - Page 9
    Position and level the cabinet Unpacking and Setup Guide 1 3/8-in. EMC2847 Attach (optional) brackets We strongly recommend that you secure your cabinet to the floor with stabilizing brackets. Make sure the cabinet is in
  • Dell VNXe2 | 40U-C Cabinet Unpacking and Setup Guide - Page 10
    Figure 2 Anti-move bracket (installed on the front and back of cabinet) (3) (3) CL4832 Figure 3 Seismic bracket (installed on the front, back, and sides of the cabinet) (3) (3) (3) (3) CL4833 10 40U-C Cabinet
  • Dell VNXe2 | 40U-C Cabinet Unpacking and Setup Guide - Page 11
    Unpacking and Setup Guide Install the lower rack bezel In some cases, the lower rack bezel ships unattached from the cabinet, or was removed to detach the shipping brackets.
  • Dell VNXe2 | 40U-C Cabinet Unpacking and Setup Guide - Page 12
    ON I O OFF ON I O OFF ON I O OFF ON I O PDP OFF (Left) ON I O OFF Ground lug CL4389 Repackaging shipping material (2-piece ramp kits only) Follow these steps to repackage the 40U-C shipping material: Procedure 1. Lay each of the outer sleeves flat, then fold it lengthwise before collapsing
  • Dell VNXe2 | 40U-C Cabinet Unpacking and Setup Guide - Page 13
    Unpacking and Setup Guide 1 2 3 CL4697 Refer to the following illustration as you perform steps 3-5. 3. Place ramp section B upside-down on the pallet, then stack section A, right-side up. 4. Stack
  • Dell VNXe2 | 40U-C Cabinet Unpacking and Setup Guide - Page 14
    CL4696 6. Band the unit with shipping straps as shown: CL4751 7. Use the following information to determine how to return the repackaged shipping material: l If the carrier unpacked the cabinet, the carrier handles the return shipment to the EMC packaging supplier. l If the cabinet was unpacked
  • Dell VNXe2 | 40U-C Cabinet Unpacking and Setup Guide - Page 15
    Unpacking and Setup Guide If you need help For questions about technical support and service, contact you service provider. For questions about upgrades, contact your sales office. More information about this and other products is available on the EMC Online Support website at http://Support.EMC.com
  • Dell VNXe2 | 40U-C Cabinet Unpacking and Setup Guide - Page 16
    used herein are the property of their respective owners. For the most up-to-date regulatory document for your product line, go to EMC Online Support (https://support.emc.com). 16 40U-C Cabinet
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16

EMC
®
40U-C Cabinet
Unpacking and Setup Guide
300-001-555
REV 05
September 3, 2014
This Unpacking and Setup Guide contains information about the EMC 40U-C cabinet.
Topics include:
Note
This document was accurate at publication time. Go to EMC Online Support (
https://
support.emc.com
) to ensure that you are using the latest version of this document.
l
Before you start
.........................................................................................................
2
l
Tools required
............................................................................................................
2
l
Hardware acclimation
................................................................................................
3
l
Steps to unpack and setup cabinet
............................................................................
3
l
Remove the ramp and shipping material from the cabinet
..........................................
4
l
Remove the cabinet shipping brackets
.......................................................................
5
l
Attach the unloading ramp
.........................................................................................
6
l
Roll the cabinet down the ramp
..................................................................................
7
l
Position and level the cabinet
....................................................................................
9
l
Attach (optional) brackets
..........................................................................................
9
l
Install the lower rack bezel
.......................................................................................
11
l
Ground the cabinet
..................................................................................................
11
l
Repackaging shipping material (2-piece ramp kits only)
...........................................
12
l
If you need help
.......................................................................................................
15