Hayward Salt & Swim 3C Salt & Swim 3C Installation Quick Start Guide

Hayward Salt & Swim 3C Manual

Hayward Salt & Swim 3C manual content summary:

  • 1
  • 2

Salt & Swim
TM
3C
Installation Quick Start
Pool is less than 30,000 gallons
You have acquired an SAS-CELL salt cell (sold separately)
There is at least 10 inches of straight pipe in the return piping after all installed equipment (and
the pipe is at least 2 inches off of the ground) to install the Cell Vessel
The Control Box will be mounted within 3 feet of a 120V GFCI outlet
The Control Box will be mounted within 15 feet of the installed Cell Vessel
The Control Box will be installed at least 10 feet away from the pool.
Pool plumbing is 1½” or 2” PVC (If black polyethylene pipe is used, see manual)
You have a saw suitable for cutting PVC
You have tools for mounting the Control Box (drill, drill bits, screwdriver)
You have a permanent marker to mark the PVC pipe
You have balanced your pool chemistry and have 3200ppm salt in your pool (see Chemistry
Quick Start Guide)
Read this entire Quick Start Guide
Remove power to filter pump
Drain water from pool piping
Verify that all parts are included in the box
You are wearing safety glasses and have read the safety precautions in the owner’s manual
Before you begin
Overview
WWW.HAYWARD.COM
855-429-9274
Pre-Installation Checklist
Installation Preparation
Turn Over
Spread out parts on ground
2” Nut Assembly (2)
1.5” Nut Assembly (2)
Control Box
Screws
Strap Wrench
Compression
Ring
Collar
STEP 1:
Mount Control Box
Mount the Control Box to a wall or post within 3 feet of a GFCI outlet, making sure that the cord will
reach. The Control Box will also have to be mounted within 15 feet of the Cell Vessel as shown in the
Overview.
Use the included Mounting Template to help locate the mounting holes and fasten the Control Box to the
intended surface.
Control Box
Mounting
Template
Cell Cap & Cord
Cell Vessel
Cutting Template
Grease
Retaining Nut
Cell Vessel
Gasket (2)
SAS-CELL
(sold separately)