HP ProLiant DL288 ISS Technology Focus, Voume 10, Number 1

HP ProLiant DL288 Manual

HP ProLiant DL288 manual content summary:

  • HP ProLiant DL288 | ISS Technology Focus, Voume 10, Number 1 - Page 1
    - We built an initial evaluation unit to test the MDC design specifications and demonstrate proof of concept. The Proto One phase - We will develop and validate the serviceability of a new MDC test unit called Proto One. Proto One features HP-patented racks that roll in and out of the bays so that
  • HP ProLiant DL288 | ISS Technology Focus, Voume 10, Number 1 - Page 2
    to identify airflow patterns and ensure acceptable circulation through the MDC system. We simulated the server heat load by installing heating elements in the racks. Figure 1.1A shows multiple heating elements installed in one of the MDC rack bays. Figure 1.1B shows one of 60 thermal sensors we
  • HP ProLiant DL288 | ISS Technology Focus, Voume 10, Number 1 - Page 3
    Power Advisor for HP ProLiant DL, ML, and BL servers is available at this URL: http://h71028.www7.hp.com/enterprise/cache/600307-0-0-0-121.html Additional resources Resource Power Regulator for ProLiant servers Technology Brief URL http://h20000.www2.hp.com/bc/docs/support/SupportMan ual/c00300430
  • HP ProLiant DL288 | ISS Technology Focus, Voume 10, Number 1 - Page 4
    ProLiant Servers VMware Knowledge Base article on ESX virtual machine performance and hardware power management URL http://h20000.www2.hp.com/bc/docs/support 3 solution includes two components: Kerberos with Generic Security Services Application Programming Interface (GSSAPI)-GSSAPI is part of the
  • HP ProLiant DL288 | ISS Technology Focus, Voume 10, Number 1 - Page 5
    HP servers. George is the Design Navigator for HP Industry-Standard Servers and Software (IS&S) and the Lead Experience Designer for HP Enterprise Servers for the front door of the current HP 10000 G2 Series Rack family. George says, ―When viewed perform usability and serviceability evaluations. Most
  • HP ProLiant DL288 | ISS Technology Focus, Voume 10, Number 1 - Page 6
    security, 7th edition HP ProLiant SL6500 Scalable System technologies Implementing Microsoft® Windows Server® 2008 R2 Service Pack 1 Release Candidate on HP ProLiant and Integrity servers Implementing RemoteFX on HP ProLiant Memory technology evolution: an overview of system memory technologies, 9th
  • HP ProLiant DL288 | ISS Technology Focus, Voume 10, Number 1 - Page 7
    /servers/technology/whitepapers/general.html#archive. Follow us on Twitter: http://twitter.com/ISSGeekatHP Legal Notices © Copyright 2011 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. The only warranties for HP products and services
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7

ISS Technology Update, Volume 10, Number 1
HP completes first phase of modular data center technology development
..................................................
1
Using HP power management technologies with VMware ESX
..................................................................
3
Kerberos technology with HP Integrated Lights-Out 3 version 1.2
...............................................................
4
Meet the Expert
George Daniels
..........................................................................................................
5
Recently published Industry-Standard Server technology papers
.................................................................
6
Contact us
...........................................................................................................................................
7
HP completes first phase of modular data center technology development
The HP Rack and Power Group and the Eaton Corporation are co-developing a fully enclosed IT rack system, or modular
data center (MDC). The MDC will provide power and cooling for a 100 KW heat load generated by four, six, or eight IT
racks. The project is partially funded by a $7.4 million grant from the U.S. Department of Energy (DOE) as part of the
American Recovery and Reinvestment Act of 2009. To read about the project and the DOE grant requirements, go to
.
Development phases
The MDC project is progressing through three development phases:
The Evaluation phase
We built an initial evaluation unit to test the MDC design specifications and demonstrate proof
of concept.
The Proto One phase
We will develop and validate the serviceability of a new MDC test unit called Proto One. Proto
One features HP-patented racks that roll in and out of the bays so that technicians can service a single rack without
affecting the operation or cooling of the remaining racks.
The Pilot One phase
Eaton will complete implementation of 360 V DC power to the MDC. We will try to integrate
MDC monitoring and control capabilities into HP System Insight Manager.