HP ProLiant SL270s ISS Technology Focus, Voume 10, Number 1

HP ProLiant SL270s Manual

HP ProLiant SL270s manual content summary:

  • HP ProLiant SL270s | ISS Technology Focus, Voume 10, Number 1 - Page 1
    Server technology papers 6 Contact us...7 HP completes first phase of modular data center technology development The HP h20000.www2.hp.com/bc/docs/support/SupportManual/c02673567/c02673567.pdf. Development the serviceability of a new MDC test unit called Proto One. Proto One features HP-patented
  • HP ProLiant SL270s | ISS Technology Focus, Voume 10, Number 1 - Page 2
    our servers. The heat loads are intended to achieve a server airtemperature delta similar to that found in HP servers. Our servers are rated airflow demands of the next-generation servers. One thing we are concerned about is the hot-aisle depth. Some servers, like the ProLiant SL models, are deeper.
  • HP ProLiant SL270s | ISS Technology Focus, Voume 10, Number 1 - Page 3
    for HP ProLiant DL, ML, and BL servers is available at this URL: http://h71028.www7.hp.com/enterprise/cache/600307-0-0-0-121.html Additional resources Resource Power Regulator for ProLiant servers Technology Brief URL http://h20000.www2.hp.com/bc/docs/support/SupportMan ual/c00300430/c00300430.pdf
  • HP ProLiant SL270s | ISS Technology Focus, Voume 10, Number 1 - Page 4
    ProLiant Servers VMware Knowledge Base article on ESX virtual machine performance and hardware power management URL http://h20000.www2.hp.com/bc/docs/support/SupportMan ual/c01549455/c01549455.pdf components: Kerberos with Generic Security Services Application Programming Interface (GSSAPI)-GSSAPI
  • HP ProLiant SL270s | ISS Technology Focus, Voume 10, Number 1 - Page 5
    HP servers. George is the Design Navigator for HP Industry-Standard Servers and Software (IS&S) and the Lead Experience Designer for HP Enterprise Servers for the front door of the current HP 10000 G2 Series Rack family. George says, ―When viewed perform usability and serviceability evaluations. Most
  • HP ProLiant SL270s | ISS Technology Focus, Voume 10, Number 1 - Page 6
    Linux device driver for HP Smart Array Controllers Server drive technology" tech brief, 5th edition Technology implementation in HP ProLiant G7 servers URL http://h20000.www2.hp.com/bc/docs/support/SupportManual/c00 190541/c00190541.pdf http://h20000.www2.hp.com/bc/docs/support/SupportManual/c01
  • HP ProLiant SL270s | ISS Technology Focus, Voume 10, Number 1 - Page 7
    /servers/technology/whitepapers/general.html#archive. Follow us on Twitter: http://twitter.com/ISSGeekatHP Legal Notices © Copyright 2011 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. The only warranties for HP products and services
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7

ISS Technology Update, Volume 10, Number 1
HP completes first phase of modular data center technology development
..................................................
1
Using HP power management technologies with VMware ESX
..................................................................
3
Kerberos technology with HP Integrated Lights-Out 3 version 1.2
...............................................................
4
Meet the Expert
George Daniels
..........................................................................................................
5
Recently published Industry-Standard Server technology papers
.................................................................
6
Contact us
...........................................................................................................................................
7
HP completes first phase of modular data center technology development
The HP Rack and Power Group and the Eaton Corporation are co-developing a fully enclosed IT rack system, or modular
data center (MDC). The MDC will provide power and cooling for a 100 KW heat load generated by four, six, or eight IT
racks. The project is partially funded by a $7.4 million grant from the U.S. Department of Energy (DOE) as part of the
American Recovery and Reinvestment Act of 2009. To read about the project and the DOE grant requirements, go to
.
Development phases
The MDC project is progressing through three development phases:
The Evaluation phase
We built an initial evaluation unit to test the MDC design specifications and demonstrate proof
of concept.
The Proto One phase
We will develop and validate the serviceability of a new MDC test unit called Proto One. Proto
One features HP-patented racks that roll in and out of the bays so that technicians can service a single rack without
affecting the operation or cooling of the remaining racks.
The Pilot One phase
Eaton will complete implementation of 360 V DC power to the MDC. We will try to integrate
MDC monitoring and control capabilities into HP System Insight Manager.