LiftMaster LA400 LA400 Manual - Page 29

» Earth Ground Rod Installation Optional + Connect Batteries - board

Page 29 highlights

WIRING » EARTH GROUND ROD INSTALLATION (OPTIONAL) + CONNECT BATTERIES EARTH GROUND ROD INSTALLATION (OPTIONAL) NOTE: For proper operation, do not connect the earth ground rod to the green screw on the outlet plate. 1 Install earth ground rod within 3 feet (0.9 m) of the operator. 2 Disconnect and remove the green/yellow ground wire connected to the screw terminal of the control board. 3 Attach earth ground rod wire to the screw terminal of the control board marked . Ensure the power wiring ground connection remains securely connected to the green screw on the outlet plate. ALARM MAGLOCK Z1 GATE 1 ACCESSORY POWER GATE 2 R4 J4 FUSE FUOSPEEN OPEN D15 C2 MOV2 Control Box R4 C2 J4 24 VAC/ SOLAR INPUT Ground Screw 12 Gauge Wire 3' (0.9 m) Earth Ground Installation (Optional) 8' (2.4 m) CONNECT BATTERIES The batteries are the main source of power for the operator. The operator is a battery run system. Both batteries are charged in circuit using the transformer (provided). The 24 Vac input can accept a charging transformer (26 Vac, 29 VA or 36 Vdc, 40 VA). 1 Connect the plugs from the batteries to the connectors on the control board. 24 VAC/ INPUT J4 MOV2 POWER C2 C64 U2 BATT 2 BATT 1 USE DEDICATED CIRCUIT 1 BATT 1 BATT 1 Connector BATT 2 Connector 28

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48

28
EARTH GROUND ROD INSTALLATION (OPTIONAL)
NOTE:
For proper operation, do not connect the earth ground rod to the green
screw on the outlet plate.
Install earth ground rod within 3 feet (0.9 m) of the operator.
Disconnect and remove the green/yellow ground wire connected to the screw
terminal of the control board.
Attach earth ground rod wire to the screw terminal of the control board
marked
. Ensure the power wiring ground connection remains securely
connected to the green screw on the outlet plate.
C2
R4
24 VAC/
SOLAR
INPUT
J4
Ground Screw
Control Box
12 Gauge Wire
Earth Ground
Installation (Optional)
3' (0.9 m)
8' (2.4 m)
WIRING
ยป EARTH GROUND ROD INSTALLATION (OPTIONAL) + CONNECT BATTERIES
1
2
3
BATT 1
MOV2
24 VAC/
INPUT
J4
USE DEDICATED CIRCUIT
CONNECT BATTERIES
The batteries are the main source of power for the operator. The operator is a
battery run system. Both batteries are charged in circuit using the transformer
(provided). The 24 Vac input can accept a charging transformer (26 Vac, 29 VA or
36 Vdc, 40 VA).
Connect the plugs from the batteries to the connectors on the control board.
BATT 2
Connector
BATT 1
Connector
1
1