Miele ESW 4816 ESW4816

Miele ESW 4816 Manual

Miele ESW 4816 manual content summary:

  • Miele ESW 4816 | ESW4816 - Page 1
    Cut-out Dimensions Page 1 of 4 Warming Drawer ESW 4816 Europa Design Clean Touch Stainless Steel with a DS installed in adjacent cabinetry Notes Miele appliances can be installed flush or proud. Discuss your installation requirements with your architect, designer and installer. All installations
  • Miele ESW 4816 | ESW4816 - Page 2
    Cut-out Dimensions Page 2 of 4 Warming Drawer ESW 4816 Europa Design Clean Touch Stainless Steel with a DS installed in adjacent cabinetry Notes Miele appliances can be installed flush or proud. Discuss your installation requirements with your architect, designer and installer. All installations
  • Miele ESW 4816 | ESW4816 - Page 3
    Product and Cut-out Dimensions Page 3 of 4 Warming Drawer ESW 4816 Europa Design Clean Touch Stainless Steel with a DS 4043 Square Series Handle Installation shown with a Miele 30" Oven O E Location Codes E - The drawer comes equipped with a 5 ft. (1.5 m) power cord with a three-prong
  • Miele ESW 4816 | ESW4816 - Page 4
    Product and Cut-out Dimensions Page 4 of 4 Warming Drawer ESW 4816 Europa Design Clean Touch Stainless Steel with a DS 4043 Signature Series Handle Side view with a Miele oven Location Codes E - The drawer comes equipped with a 5 ft. (1.5 m) power cord with a three-prong grounding plug ready
  • 1
  • 2
  • 3
  • 4

Product and Cut-out Dimensions
Page 1 of 4
Warming Drawer
ESW 4816 E
D
i
Cl
T
h St i l
St
l
ith
DS 4043
ESW 4816 Europa Design Clean Touch Stainless Steel with a DS 4043
Square Series Handle
O
E
Location Codes
E – The drawer comes equipped with a 5 ft. (1.5 m) power
cord with a three-prong grounding plug ready for connection
to a 120V, 15 A, 60 Hz power supply.
O – 1” ² minimum hole size for plug. Outlet to be
Note: Drawing is not to scale
Specification Sheets OJS 11142011
installed in adjacent cabinetry
Notes
Miele appliances can be installed
flush or proud. Discuss
your installation requirements with your architect, designer
and
installer.
All installations must be done in accordance with local codes.