Motorola SB6121 Installation Guide - Page 9

Product Overview, Front Panel - docsis 3 0 cable modem

Page 9 highlights

2 Front Panel B Product Overview The SB6121 front panel icons provide the following modem status information for power, communications, and errors: ICON 1 2 3 4 FLASHING Not applicable - icon does not flash ON Green: Power is properly connected Scanning for a downstream (receive) channel connection Scanning for an upstream (send) channel connection Scanning for an Internet connection Green: Non-bonded downstream channel is connected Blue*: High-speed Internet connection with bonded downstream channels Green: Non-bonded upstream channel is connected Blue*: High-speed Internet connection with bonded upstream channels Green: Startup process completed Product Overview • Front Panel SB6121 DOCSIS 3.0® Cable Modem • Installation Guide 3 Uncontrolled Document

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27

B
Product Overview • Front Panel
SB6121 DOCSIS 3.0® Cable Modem • Installation Guide
3
Uncontrolled Document
2
Product Overview
Front Panel
The SB6121 front panel icons provide the following modem status information for
power, communications, and errors:
ICON
FLASHING
ON
1
Not applicable — icon does
not flash
Green
: Power is properly connected
2
Scanning for a downstream
(receive) channel connection
Green
: Non-bonded downstream
channel is connected
Blue*
: High-speed Internet
connection with bonded
downstream channels
3
Scanning for an upstream
(send) channel connection
Green
: Non-bonded upstream
channel is connected
Blue*
: High-speed Internet
connection with bonded upstream
channels
4
Scanning for an Internet
connection
Green
: Startup process completed