NordicTrack Sl720 English Manual - Page 5

Assembly - exercise cycle

Page 5 highlights

ASSEMBLY Assembly requires two persons. Place all parts of the exercise cycle in a cleared area and remove the packing materials. Do not dispose of the packing materials until assembly is completed. Assembly requires the included tools and your own adjustable wrench . Use the drawings below to identify the small parts used in assembly. The number in parenthesis below each drawing refers to the key number of the part, from the PART LIST on page 25. The second number refers to the quantity needed for assembly. Note: Some small parts may have been pre-assembled for shipping. If a part is not in the parts bag, check to see if it has been pre-assembled. M8 Split Washer (55)-12 M8 Washer (60)-4 M10 Split Washer (88)-2 M10 Nylon Locknut (63)-2 M4 x 16mm 1/4" x 16mm Button Screw (57)-4 Screw (80)-8 M8 x 25mm Button Screw (79)-4 M8 x 40mm Button Screw (54)-8 M10 x 52mm Button Bolt (82)-2 M10 x 110mm Button Screw (78)-2 1. Identify the Front Stabilizer (15). While another person lifts the front of the Frame (1), attach the Front 1 Stabilizer to the Frame with four M8 x 40mm Button Screws (54) and four M8 Split Washers (55). 1 15 55 55 54 54 5

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28

5
ASSEMBLY
Assembly requires two persons.
Place all parts of the exercise cycle in a cleared area and remove the packing
materials. Do not dispose of the packing materials until assembly is completed.
Assembly requires the included tools and your own adjustable wrench
.
Use the drawings below to identify the small parts used in assembly. The number in parenthesis below each
drawing refers to the key number of the part, from the PART LIST on page 25. The second number refers to the
quantity needed for assembly.
Note: Some small parts may have been pre-assembled for shipping. If a part
is not in the parts bag, check to see if it has been pre-assembled.
M10 Nylon
Locknut (63)–2
M8 Split
Washer (55)–12
M10 Split
Washer (88)–2
M8 x 25mm Button
Screw (79)–4
M8 Washer
(60)–4
M10 x 52mm Button Bolt (82)–2
M4 x 16mm
Screw (57)–4
M10 x 110mm Button Screw (78)–2
1/4” x 16mm Button
Screw (80)–8
M8 x 40mm Button
Screw (54)–8
1.
Identify the Front Stabilizer (15). While another person
lifts the front of the Frame (1), attach the Front
Stabilizer to the Frame with four M8 x 40mm Button
Screws (54) and four M8 Split Washers (55).
15
1
55
55
54
54
1