Weider E9000 Home Gym Assembly Instructions

Weider E9000 Home Gym Manual

Weider E9000 Home Gym manual content summary:

  • Weider E9000 Home Gym | Assembly Instructions - Page 1
    I • 1 li 0 iii 4111%14.• E9000 ASSEMBLY INSTRUCTIONS REPLACEMENT PARTS WEIDER HEALTH AND FITNESS 21100 ERWIN STREET, WOODLAND HILLS, CA., USA 91367
  • Weider E9000 Home Gym | Assembly Instructions - Page 2
    E9000 PARTS LIST DIAGRAM NO PART NAME 1 BASE FRAME 2 ARM PRESS FRAME UPRIGHT 3 PEC-DECK FRAME UPRIGHT 4 SEAT FRAME 5 SHORT GUIDE ROD 6 LONG GUIDE ROD 7 WEIGHT PLATES 8 WEIGHT SELECTOR TUBE 9 TOP FRAME MAST 10 PEC-DECK MOUNTING ASSEMBLY 11 6" MOUNTING PLATES 12 BACKREST 13
  • Weider E9000 Home Gym | Assembly Instructions - Page 3
    MANUAL TRAINING MANUAL , F QTY 2 2 1 1 1 SET 1 1 1 1 1 1 ORDERING NO DE-4158 DE-4155 DE-4156 DE-4157 DE-4159 C5871-E02 O5872-E02 O5873-E02 C5874-E02 NN-1117 NN-1094 1 1 CALCULATING RESISTANCE OF WORK OUT STATIONS BECAUSE OF THE UNIQUE CABLING SYSTEM OF THIS HOME GYM GUIDE RODS AND PULLEY ADEQUATELY
  • Weider E9000 Home Gym | Assembly Instructions - Page 4
    REPRESENTS THE STATE OF THE ART IN TECHNOLOGY IN HOME FITNESS EQUIPMENT. EVERY EFFORT HAS BEEN MADE TO BRING TO YOU THE PACKING AND CARTON UNTIL THE UNIT IS COMPLETELY ASSEMBLED, 0 NOT DESTROY THE INSTRUCTION MANUAL, USE IT FOR ORDERING REPLACEMENT PARTS. I HELP SECURE PLASTIC CAPS IN TUBING
  • Weider E9000 Home Gym | Assembly Instructions - Page 5
    62 90 DETAIL A 3 60 0 ,IiL 60 r- C i 71 53 60 a 60 *L 70 L I I 50 1 111 71 5 I50 . va7 u With BASE FRAME (1) positioned so that guide rod holes are on the top, press RUBBER BASE FEET (70) onto ends of 1 1/2" X 3" Base Members. u Cap end of 2" Base Frame with 2" SQUARE PLASTIC
  • Weider E9000 Home Gym | Assembly Instructions - Page 6
    using 5/16" X 2 1/2" HEX HEAD BOLT (54), 5/16" FLAT WASHERS (61), and 5/16" NYLON LOCK NUT (60). El Position LONG GUIDE ROD (6) into Front Guide Rod Location so that the bolt hole through the Guide Rod is at the top. (This is later bolted to the Top Mast.) u Slide ROUND WEIGHT BUMPERS (73) over
  • Weider E9000 Home Gym | Assembly Instructions - Page 7
    (97) to WEIGHT PLATES (7) starting with 20 on the top plate and finishing with 150 on the bottom plate. El Position TOP FRAME MAST (9) over Guide Rods and align with Upright Brackets. El Bolt TOP FRAME MAST (9) to ARM PRESS FRAME UPRIGHT (2) using 5/16" X 3 1/4" HEX HEAD BOLTS (55), 5/16" FLAT
  • Weider E9000 Home Gym | Assembly Instructions - Page 8
    Bracket Ear. Assemble Second Pulley to outside of Bracket and secure with 3/8" NYLON LOCK NUT (62). SEE DETAIL DRAWING BI ▪ Align bolt hole in LONG GUIDE ROD (6) with Fastening Hole in TOP MAST FRAME (9) and secure with 5/16" X 3" HEX HEAD BOLT (51), 5/16" FLAT WASHERS (61), and 5/16" NYLON LOCK NUT
  • Weider E9000 Home Gym | Assembly Instructions - Page 9
    into place and press on the other 3 1/4" X 7" FOAM ROLLER PAD (30). u About three inches above the Backrest Pad, position and afix the STATION 1/MULTI-GYM DECAL (95). 78 &40 )7 v ) 63-9 61 6 8 78 16 DETAIL C 16 4 0 (1 =D 18 79 61 60 7..9 -11) 38 19 71 79 STEP 5 ARM PRESS ASSEMBLY
  • Weider E9000 Home Gym | Assembly Instructions - Page 10
    3/8" NYLON LOCK NUT (62). 9 STEP 6 PEC-DECK ASSEMBLY RT. QTY 3/8" BOLT 3/8" NY•. LONLOCK 68 5/t5",X 1 1/2" HEX HEAD BOLT 60 i5/16" NYLON LOCK NUT 92 2" .GUIDE PULLET!: 67 2 1/4" QI;74,WASHER 80 .1. 1/2" SQUARE PLASTIC INSERT CAP 2 78 1" ROUND PLASTIC INSERT CAP
  • Weider E9000 Home Gym | Assembly Instructions - Page 11
    ED-62 92 67 60 BRACKET PL TES 10 68 87 El First, assemble 2" GUIDE PULLEYS (92) into Bracket Plates welded to Top Section of PEC-DECK UPRIGHT (3). El Bolt in place with 3/8" X 2 1/4" HEX HEAD BOLTS (67) and 3/8" NYLON LOCK
  • Weider E9000 Home Gym | Assembly Instructions - Page 12
    (23) to Seat Tube on 57 PEC-DECK UPRIGHT (3) using 5/16" X 2 1/2" HEX HEAD BOLT (54) and 5/16" NYLON LOCK NUT (60). u Fasten bottom of SEAT SUPPORT BRACE (23) to PEC-DECK UPRIGHT (3) with 5/16" X 3" HEX HEAD BOLT (51), 5/16" FLAT WASHER (61), and 5/16" NYLON LOCK NUT (60). 31 u Press 2" SQUARE
  • Weider E9000 Home Gym | Assembly Instructions - Page 13
    25 92 63 60 62 26 u Route Lat Cable from LAT PULLEY (1) back over top center PULLEY (2) then down through top mast access hole between Guide Rodd. SEE ILLUSTRATION! u Next, bring cable back up and over outside TOP PULLEY (3) then forward and around PULLEY (4) on ARM PRESS (16 ). u From ARM PRESS
  • Weider E9000 Home Gym | Assembly Instructions - Page 14
    and 3/8" NYLON LOCK 14 NUT (62). 54 ] Bring Cable down and under 4 1/2" PULLEY (90). Assemble Pulley to inside of Base Pulley Bracket at Guide Rod position In BASE FRAME (1). Use 3/8" 61 X 1 3/4" HEX HEAD BOLT (52) and 3/8" NYLON Pp LOCK NUT (62) to secure. \ 62 ]Assemble PULLEY CONNECTOR
  • Weider E9000 Home Gym | Assembly Instructions - Page 15
    41, !i ~r jai ;ill! Ill; THERE ARE SEVERAL ACCESSORY ITEMS INCLUDED WITH THE HOME GYM ['CURL BAR: The first is the 1" X 16" CURL BAR (41) which Tube with "S" HOOK (84). This Bar is used to do all Lat Pull-Down Exercises. u LEG STRAP: Using "S" HOOK (84), LEG STRAP (39) is connected to Base Pulley
  • Weider E9000 Home Gym | Assembly Instructions - Page 16
    YOUR WARRANTY CARD CUSTOMER SERVICE 1-800-225-0653 ALL OF THE PARTS FOR THE WEIGHTBENCH CAN BE ORDERED FROM WEIDER HEALTH AND FITNESS, PARTS SERVICE DEPT., 900 WEST STARTING YOUR EXERCISE PROGRAM ADVISABLE Ta::::,i4AVE:']:.kPHYSICAL!'::'EXAMIN#J.JON BY YOUR PHYSICIAN ENTER ANY EXERCISE PROGRAM IT
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16

I
1
li
0
ii
i
4111
%14.•
E9000
ASSEMBLY
INSTRUCTIONS
REPLACEMENT
PARTS
WEIDER
HEALTH
AND
FITNESS
21100
ERWIN
STREET,
WOODLAND
HILLS,
CA.,
USA
91367