Weider Pro 5500 User Manual - Page 20

Pulley 48. Attach the Pulley to the Double U

Page 20 highlights

33. Wrap the Leg Lever Cable (51) under a 90mm Pulley (48). Attach the Pulley to the Base (1) with 33 an M10 x 45mm Bolt (86), two Half Guards (55), and an M10 Nylon Locknut (77). 34. Wrap the Leg Lever Cable (51) over a 90mm Pulley (48). Attach the Pulley to the Double "U"- 34 bracket (61) with an M10 x 45mm Bolt (86), two Half Guards (55), and an M10 Nylon Locknut (77). 35. Wrap the Leg Lever Cable (51) under a 90mm 35 Pulley (48). Attach the Pulley to the Upright (2) with an M10 x 120mm Bolt (115), two Half Guards (55), an M10 Washer (80), and a Cable Trap (56). 51 48 86 55 1 55 77 77 61 55 48 51 86 55 115 2 80 48 51 56 55 55 20

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36

20
33. Wrap the Leg Lever Cable (51) under a 90mm
Pulley (48). Attach the Pulley to the Base (1) with
an M10 x 45mm Bolt (86), two Half Guards (55),
and an M10 Nylon Locknut (77).
34. Wrap the Leg Lever Cable (51) over a 90mm
Pulley (48). Attach the Pulley to the Double ā€œUā€-
bracket (61) with an M10 x 45mm Bolt (86), two
Half Guards (55), and an M10 Nylon Locknut
(77).
35. Wrap the Leg Lever Cable (51) under a 90mm
Pulley (48). Attach the Pulley to the Upright (2)
with an M10 x 120mm Bolt (115), two Half Guards
(55), an M10 Washer (80), and a Cable Trap (56).
33
34
77
61
55
55
86
51
48
1
48
55
55
77
51
86
35
115
80
48
56
2
55
55
51