Epson 750HD Installation Guide - ELPMBUNI Universal Mount Assembly
Epson 750HD Manual
View all Epson 750HD manuals
Add to My Manuals
Save this manual to your list of manuals |
Epson 750HD manual content summary:
- Epson 750HD | Installation Guide - ELPMBUNI Universal Mount Assembly - Page 1
INSTALLATION MANUAL IN-ELPMBUNI.R3 ELPMBUNI EPSON AMERICA, INC. INDIANAPOLIS DISTRIBUTION CENTER 2350 Stafford Road Suite 101 Plainfield, IN 46168 - Epson 750HD | Installation Guide - ELPMBUNI Universal Mount Assembly - Page 2
PURPOSE. Contact Premier Mounts In the event of missing and/or damage equipment, or technical questions, the following information can help in the completion of the installation. Customer Service - (800) 368-9700 Technical Support - [email protected] Installation Instructions Page - 3 - - Epson 750HD | Installation Guide - ELPMBUNI Universal Mount Assembly - Page 3
INSTRUCTIONS SHOULD BE READ AND COMPLETELY UNDERSTOOD. THE INSTALLATION INSTRUCTIONS must support the weight, or load, of the projector. When mounting to a ceiling that contains projector. Recommended mounting surfaces: wooden studs, solid-flat concrete, and reinforced metal studs. If the mount - Epson 750HD | Installation Guide - ELPMBUNI Universal Mount Assembly - Page 4
are parts missing and/or damaged, please stop the installation and contact Premier Mounts (800-368-9700). Upper Assembly (Qty 1) Mounting Bracket Mounting screws will vary by projector. Please see the following pages for model specific hardware: Pages 10, 11, 12, and 13. Installation Manual - Epson 750HD | Installation Guide - ELPMBUNI Universal Mount Assembly - Page 5
Assembly A Single Wooden Stud Mounting Points B Solid Structure Mounting Points C Ceiling Plate D Allen Wrench E Height Adjustment Screws F Tension Knobs G Safety Knob H Security Screws I Leveling Barrels J Universal Mounting Bracket K Leg Assembly L Projector (Not Supplied) M Tri-Lock Opening - Epson 750HD | Installation Guide - ELPMBUNI Universal Mount Assembly - Page 6
serious personal injury and possible damage to the projector. CAUTION: THE PROJECTOR IS FRAGILE; HANDLE WITH CARE AT ALL TIMES. NOTE: Review the projectors manufacture's operation manual and refer to the ceiling installation instruction. Here you will normally find important reference information - Epson 750HD | Installation Guide - ELPMBUNI Universal Mount Assembly - Page 7
upper assembly from the projector mounting bracket by slightly loosening the two tension knurl knobs to create free play between the bracket tri-lock assembly and the upper section tri-lock assembly points. 5. Next loosen the safety screw knurl knob far enough to allow the two parts to be rotated - Epson 750HD | Installation Guide - ELPMBUNI Universal Mount Assembly - Page 8
The levelers and leg assembly screws must be loose in order to adjust the height of the mounting bracket. FIGURE 6 Two-Piece Leg FIGURE 7 One-Piece Leg Allen Wrench Mounting Hardware Inverted Projector Leveling Barrels FIGURE A Installation Manual Figure 5 Line up the leveling barrels to the - Epson 750HD | Installation Guide - ELPMBUNI Universal Mount Assembly - Page 9
the leg combination, simply ensure access to filters and lamp housings when aligning brackets. This mount works with all sub-25 pound projectors. PowerLite S3, S4, 62C, 76C, 82C, Hardware: M4 x 12mm (Qty 3) Page - 10 - PowerLite 830p, 835p Hardware: M4 x 12mm (Qty 4) Installation Manual - Epson 750HD | Installation Guide - ELPMBUNI Universal Mount Assembly - Page 10
ELPMBUNI Top View Front View PowerLite 732c, 737c, 740C, 745C, 750c, 755c, 760c, 765c Hardware: M4 x 12mm (Qty 3) Installation Manual Page - 11 - - Epson 750HD | Installation Guide - ELPMBUNI Universal Mount Assembly - Page 11
ELPMBUNI PowerLite 7800p, 7850p, 7900p Hardware: M4 x 12mm (Qty 4) Page - 12 - PowerLite 61p, 81p, 821p Hardware: M4 x 12mm (Qty 4) Installation Manual - Epson 750HD | Installation Guide - ELPMBUNI Universal Mount Assembly - Page 12
ELPMBUNI PowerLite S1, S1+ Hardware: M4 x 12mm (Qty 3) Installation Manual PowerLite 6100i Hardware: M4 x 12mm (Qty 4) Page - 13 - - Epson 750HD | Installation Guide - ELPMBUNI Universal Mount Assembly - Page 13
bracket so that it avoids most, if not all, ventilation points (including lamp & filter access doors). 2. When the position desired is achieved tighten the mounting hardware to the projector then tighten the hex head leg screws with the Allen wrench (supplied) (Figure 8 and Figure 9). CAUTION - Epson 750HD | Installation Guide - ELPMBUNI Universal Mount Assembly - Page 14
(supplied) or with other (commercially available) hardware depending on your installation environment (Figure 9). Ceiling Structure Ceiling Wood Stud Wood Screws Upper Assembly Installation Manual Knurl Knobs (3ea) Figure 9 Secure the ceiling mount to the center of the wood stud. Page - 15 - - Epson 750HD | Installation Guide - ELPMBUNI Universal Mount Assembly - Page 15
mount assembly, you can convert the height to only 2 ½" by simply removing the adjustment channel as shown. 2. Once the extension channel is removed, attach the upper ceiling plate to the ceiling and Star Washers Remove the Middle Extension Completely Ceiling Plate Remove the M8 x 16mm Screws, Flat - Epson 750HD | Installation Guide - ELPMBUNI Universal Mount Assembly - Page 16
Wood Stud Figure 11 Wood Screws Ceiling Structure Attach Bell Housing to the Ceiling Plate Figure 12 NOTE: Do not use the star washers on a close ceiling application. Allen Wrench Wood Stud Secure the Bell Housing with Two M8 x 16mm Screws and Flat Washers Only Installation Manual Page - 17 - - Epson 750HD | Installation Guide - ELPMBUNI Universal Mount Assembly - Page 17
mounting plate in the base of the upper assembly. 2. Carefully lift the projector and insert the mounting Once inserted rotate the projector and mounting bracket 180° and mounting bracket to the upper assembly Insert universal bracket to the tri-lock, then rotate the projector 180° Universal Mount - Epson 750HD | Installation Guide - ELPMBUNI Universal Mount Assembly - Page 18
Final Adjustments 1. With the projector secured in the mount and power on and signal supplied to the projector you can now proceed with Wood Stud Ceiling Allen Wrench Height Adjustable Screws (Roll) Adjusting Screws Allen Wrench Installation Manual Figure 14 Figure 15 Wood Stud Ceiling Tilt - Epson 750HD | Installation Guide - ELPMBUNI Universal Mount Assembly - Page 19
ELPMBUNI Installing the Plastic Caps 1. Once all the final adjustments have been done, install the plastic caps on the leveling barrels (Figure 17). Figure 17 Page - 20 - Installation Manual
INSTALLATION MANUAL
ELPMBUNI
EPSON AMERICA, INC.
INDIANAPOLIS DISTRIBUTION CENTER
2350 Stafford Road Suite 101
Plainfield, IN 46168
IN-ELPMBUNI.R3