Garmin Reactor 40 Kicker Autopilot Reactor 40 Kicker Mercury EFI Installation

Garmin Reactor 40 Kicker Autopilot Manual

Garmin Reactor 40 Kicker Autopilot manual content summary:

  • 1
  • 2

Reactor™ 40 Kicker Mercury EFI
Installation Examples
You can use these photographic examples to help when following the
instructions included with your Reactor 40 Kicker and Mercury EFI motor.
Removing the Tiller Lock
NOTICE:
You must use caution when disassembling the motor to remove the tiller
lock and installing the steering and throttle actuators. The provided photos
are examples, and may not accurately represent your motor. For further
information, you may need to consult your motor manufacturer for guidance.
Garmin is not responsible for damage caused to your motor when removing
the tiller lock or installing this product.
NOTE
: If your motor has a tiller lock
, it must be removed before installing
the steering actuator. Remove the bolts
to access the tiller lock assembly.
Tiller Lock
Removing the Tiller Lock
Remove the tiller lock assembly
before installing the linkage arm assembly.
Steering Actuator Installation Examples
Installing the Steering Actuator Bracket Between the Tiller Arm and Motor
Complete Steering Actuator Installation
Steering Actuator Spacer Stack Order
April 2020
190-02451-25_0A
Printed in Taiwan
© 2020 Garmin Ltd. or its subsidiaries