Haier QBJ1-230A58E User Manual

Haier QBJ1-230A58E Manual

Haier QBJ1-230A58E manual content summary:

  • Haier QBJ1-230A58E | User Manual - Page 1
    Solar Water Heater Instruction for use QBJ1-130A58E QBJ1-150A58E QBJ1-175A58E QBJ1-200A58E QBJ1-230A58E QBJ1-270A58E Please read this manual before usage Retain it for future reference
  • Haier QBJ1-230A58E | User Manual - Page 2
  • Haier QBJ1-230A58E | User Manual - Page 3
    assembly 6 Extraventricular plumbing instructions 7 Indoor plumbing instructions 7 Installation notice 8 Pipelines thermal insulation notice 9 The product with controller installation and using notice 9 Using Instruction The operation method 10 Troubles treatment 11 Packing list
  • Haier QBJ1-230A58E | User Manual - Page 4
    sheet. 4. Frame: Steady structure, shapely and durable . Appearance and parts Outer shell Cover Evacuated tubes Silicon seal ring Frame Base support Foot cushion Technical parameter Models QBJ1-130A58E QBJ1-150A58E QBJ1-175A58E QBJ1-200A58E QBJ1-230A58E QBJ1-270A58E Specification of tubes
  • Haier QBJ1-230A58E | User Manual - Page 5
    Precautions Precautions 1.When using the water heater with electric heating, ensure that electric heating and electric tracing belt are closed. 2. Avoiding irradiation without water after installation, it can't be used immediately, it should be sheltered. 3. When supplying water at the first time,
  • Haier QBJ1-230A58E | User Manual - Page 6
    Before use Notice Please take time to read this manual and familiarize yourself with the function of this production. 1. Please check out the packing list. 2.If you fix electric auxiliary heating and controller, please select
  • Haier QBJ1-230A58E | User Manual - Page 7
    Assembly Instruction The location: 1. Please install the solar water heater in the area that avoid the thunder. 2. Solar water heater angle range: east to south for 10 ,
  • Haier QBJ1-230A58E | User Manual - Page 8
    Assembly Instruction Tank assembly 1. Unpacking the tank, rip off the protection film. Uninstall the nut and cushion. 2. Place tank onto tank bracket cradle, inserting protruding bolts into
  • Haier QBJ1-230A58E | User Manual - Page 9
    Assembly Instruction Glass tube assembly 1. Keep tubes out of the irradiation while assembling the unit or a scald may be caused. 2. Place the rounded side of rubber seal downwards on the open end of tubes.(A) 3. Insert the tube into base support of locating hole with gentle pressure and twisting
  • Haier QBJ1-230A58E | User Manual - Page 10
    -150A58E QBJ1-175A58E QBJ1-200A58E QBJ1-230A58E QBJ1-270A58E A b a Remarks: The permitted error limit of above parameters is 10%. Indoor plumbing instructions Solar water heater Water level sensor Electric heating Connect the line of tracing belt Controller Pre-burrided cord slot Tap water Hot
  • Haier QBJ1-230A58E | User Manual - Page 11
    Assembly Instruction Installation notice 1. Any alteration to the structure of the solar water heater may cause the trouble while using it. 2. There water. 6. The installation project should be confirmed by our professional service personnel when install several sets of these series. Contact to the
  • Haier QBJ1-230A58E | User Manual - Page 12
    Assembly Instruction Pipelines thermal insulation notice 1.Outdoor pipelines should be thermal insulated according to local climate, bad thermal insulation may lead to heat loss. 2.The outlet used
  • Haier QBJ1-230A58E | User Manual - Page 13
    Assembly Instruction Using Instruction 7.If the controller you choose has automatic water supply function, electromagnetic valve must be fixed in room horizontally; the direction of arrowhead labled on valve is the direction of water running out. Suggest fixing manual water supply side line, ensure
  • Haier QBJ1-230A58E | User Manual - Page 14
    Instruction Troubles treatment Phenomenon Possible reason Treatment No water supply The tank is empty Supply water according to the manual parts Quantity Storage Storage tank tank box Manual Tank bracket box Left bracket support Right bracket support 2 2 Evacuated tubes 25 30 Frame
  • Haier QBJ1-230A58E | User Manual - Page 15
  • Haier QBJ1-230A58E | User Manual - Page 16
    Made in China Rev. 01 Specific Number 0040500680F
  • Haier QBJ1-230A58E | User Manual - Page 17
    Solar water heater controller Instruction for use HR-QBJ1-KSD Please read this manual before usage Retain it for future reference
  • Haier QBJ1-230A58E | User Manual - Page 18
    Switch on/off the controller and parameters setting 4 Main function operation 5 Error display and handling 8 Installation Instructions Installation notice 9 Electric water heater, water temperature and level sensor installation 9 Indoor pipe and electromagnetic valve installation
  • Haier QBJ1-230A58E | User Manual - Page 19
    cord is damaged, in order to avoid risk, it must be replaced by factory or maintenance department or full-time staff. Product Instruction System components The system is composed of main controller, water temperature and water level sensor, electromagnetic valve, electric heater, cable etc. Working
  • Haier QBJ1-230A58E | User Manual - Page 20
    130mm 48mm 12.Allowable environment humidity:
  • Haier QBJ1-230A58E | User Manual - Page 21
    Function Instruction 5.Water supply: the sign shows that water is supplying. 6.Pressure as per need, water will be supplied to pre-set level at pre-set time automatically. 4.Manual heating: press , key electric heating can be activated immediately, when the water temperature reaches the setting
  • Haier QBJ1-230A58E | User Manual - Page 22
    needs to be equipped ) Notice electricity heating belt and pump are optional functions, you can choose one of the functions as you need. Using Instruction Switch on/off the controller and parameters setting 1.Switch machine on/off Connect the power, all sign will light and will run self-check
  • Haier QBJ1-230A58E | User Manual - Page 23
    Using Instruction and exit from the set mode. Continue to press key to enter the other functions. For example, the water supply time can be adjusted while heating. Main function operation 1.Manual water supply (1)When the water level below the set level, press key , the water can reach the
  • Haier QBJ1-230A58E | User Manual - Page 24
    will buzz once per minute to remind user notice whether the water overflows. Instruction: calculate by water flow is 0.6-0.8 m/s and the water pipe is 1/2 water level, water supply will stop automatically in 10 seconds. 3.Manual heating (1)When the temperature is lower than the set value and
  • Haier QBJ1-230A58E | User Manual - Page 25
    Installation Instruction the pre-set value, electric heating will activate automatically until reaching the pre-set temperature. (2)If the water temperature lower than the set value and
  • Haier QBJ1-230A58E | User Manual - Page 26
    Installation Instruction (2)When the system opens electromagnetic valve to supply water, pump will be activated automatically to pump water; when stopping supplying water, pump will be closed
  • Haier QBJ1-230A58E | User Manual - Page 27
    frequently of threshold 1.Install pump 2.Clean the electromagnetic valve filter. 3.Replace electromagnetic valve Supply or releasesome water Installation instruction Installation notice 1.These products must be installed by professional staff 2.Controller must stay away from water. 3.Prohibit
  • Haier QBJ1-230A58E | User Manual - Page 28
    Installation Instruction follows the diagrammatic chart of electric heater. Connect electric heater's heating wire Plug Spacing Solenoid valve wire mm Solenoid Back Tap water valve valve Manual valve Mixing Valve Anti-freeze function of pipeline installation chart Solenoid valve wire
  • Haier QBJ1-230A58E | User Manual - Page 29
    Installation Instruction Indoor pipe and electromagnetic valve installation notice 1.Refer to the corresponding installation chart, connect indoor pipeline. 2.Flush pipe before installing electromagnetic valve, clean the impurities. 3.
  • Haier QBJ1-230A58E | User Manual - Page 30
    Installation Instruction electromagnetic valve arbitrarily; the sensor has four wires, blue one and red one are water level wires, they are joined to the two terminal of
  • Haier QBJ1-230A58E | User Manual - Page 31
    Packing list Packing list Name Size, specification Quantity Main engine Solenoid valve with 3 meters line Hanging board HR-QBJ1-KSD Holding-down clip Plastic expander tube 6 Self-tapping screw ST 4 25 cross slot and round head Self-tapping screw ST2.9 6.5 cross slot and round head Self-
  • Haier QBJ1-230A58E | User Manual - Page 32
    Rev. 01 Specific Number 0040500680G
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32

Instruction for use
QBJ1-130A58E
QBJ1-150A58E
QBJ1-175A58E
QBJ1-200A58E
QBJ1-230A58E
QBJ1-270A58E
Please read this manual before usage
Retain it for future reference
Solar Water Heater