HP BladeSystem c3000 HP BladeSystem c3000 Tower Enclosure Quick Setup Instruct
HP BladeSystem c3000 Manual
View all HP BladeSystem c3000 manuals
Add to My Manuals
Save this manual to your list of manuals |
HP BladeSystem c3000 manual content summary:
- HP BladeSystem c3000 | HP BladeSystem c3000 Tower Enclosure Quick Setup Instruct - Page 1
HP BladeSystem c3000 Tower Enclosure Quick Setup Instructions Part Number 457023-003 August 2008 (Third Edition) - HP BladeSystem c3000 | HP BladeSystem c3000 Tower Enclosure Quick Setup Instruct - Page 2
blade Fan blank A mandatory insert installed in any unused fan bay HP Active Cool fan (quantity as ordered) A fan used to cool the components installed in the enclosure Enclosure/Onboard Administrator link module The module used to provide enclosure-link connectivity and Onboard Administrator - HP BladeSystem c3000 | HP BladeSystem c3000 Tower Enclosure Quick Setup Instruct - Page 3
bay numbering Installing the front components CAUTION: To prevent improper cooling and thermal damage, do not operate the blade or the enclosure unless all hard drive and device bays are populated with either a component or a blank. 1. If necessary, slide the Onboard Administrator module into the - HP BladeSystem c3000 | HP BladeSystem c3000 Tower Enclosure Quick Setup Instruct - Page 4
. 3. Add any of the following ordered options to each server blade o Additional processor o Additional memory o Mezzanine option cards (See "Mapping to interconnect ports (on page 7).") 4. (Optional) Choose one of the following options. o If you are installing a full-height device, remove the - HP BladeSystem c3000 | HP BladeSystem c3000 Tower Enclosure Quick Setup Instruct - Page 5
the enclosure until it locks in place. a. The HP BladeSystem c3000 Tower Enclosure is shipped with four HP Active Cool Fans and supports up to six fans. Install fans based on the number of blades installed: - For one to four half-height blades or one to two full- height blades, install four fans in - HP BladeSystem c3000 | HP BladeSystem c3000 Tower Enclosure Quick Setup Instruct - Page 6
amperage draw of your HP BladeSystem c3000 Tower Enclosure configuration, see the HP power calculator (http://www.hp.com/go/bladesystem/powercalculator). Only trained service personnel must perform installation and maintenance. 2. Slide the power supply into the power supply bay until the device - HP BladeSystem c3000 | HP BladeSystem c3000 Tower Enclosure Quick Setup Instruct - Page 7
all iLO ports on each blade, and supporting interconnect module management parts. 4 OA2/iLO Reserved for future Onboard Administrator connections. NOTE: If the Onboard Administrator is connected to a network with a DHCP server when you power up the enclosure, the Onboard Administrator and each iLO - HP BladeSystem c3000 | HP BladeSystem c3000 Tower Enclosure Quick Setup Instruct - Page 8
interconnect module Mapping full-height blades The following table lists the available configurations for full-height devices installed in device bay N (1-4). NOTE: The port mapping configurations listed in the table below do not match the HP BladeSystem c7000 Enclosure port mapping configurations - HP BladeSystem c3000 | HP BladeSystem c3000 Tower Enclosure Quick Setup Instruct - Page 9
PCIe module to a partner blade such as a tape blade or a PCI expansion blade. For full-height blades, these signals are used to connect a PCIe module to a partner blade in the lower adjacent bay and require a PCIe pass-thru mezzanine card installed in mezzanine connector 3. The Onboard Administrator - HP BladeSystem c3000 | HP BladeSystem c3000 Tower Enclosure Quick Setup Instruct - Page 10
on individual interconnect modules, see the documentation that ships with the interconnect module. 1. Install the interconnect modules based on the quantity ordered and the number of fabrics in the configuration. The enclosure ships with interconnect bay dividers installed. The interconnect bay - HP BladeSystem c3000 | HP BladeSystem c3000 Tower Enclosure Quick Setup Instruct - Page 11
HP BladeSystem Onboard Administrator User Guide. Setting up the Onboard Administrator using the HP BladeSystem Insight Display When the enclosure is powered up for the first time, the Insight Display launches an installation wizard to guide you through the configuration process. After configuring - HP BladeSystem c3000 | HP BladeSystem c3000 Tower Enclosure Quick Setup Instruct - Page 12
BladeSystem c3000 Tower Enclosure Setup and Installation Guide. You can also find information on the HP website (http://www.hp.com/go/bladesystem/documentation). 13. Open a browser and connect to the active Onboard Administrator module using the Onboard Administrator IP address that was configured
HP BladeSystem c3000 Tower Enclosure
Quick Setup Instructions
Part Number 457023-003
August 2008 (Third Edition)