HP Cluster Platform Hardware Kits v2010 ProCurve 6400 CX4 Cable Management Kit
HP Cluster Platform Hardware Kits v2010 Manual
View all HP Cluster Platform Hardware Kits v2010 manuals
Add to My Manuals
Save this manual to your list of manuals |
HP Cluster Platform Hardware Kits v2010 manual content summary:
- HP Cluster Platform Hardware Kits v2010 | ProCurve 6400 CX4 Cable Management Kit - Page 1
HP Cluster Platform ProCurve 6400 CX4 Cable Management Kit Installation Guide HP Part Number: 5991-7987 Published: July 2007 - HP Cluster Platform Hardware Kits v2010 | ProCurve 6400 CX4 Cable Management Kit - Page 2
contained herein is subject to change without notice. The only warranties for HP products and services are set forth in the express warranty statements accompanying such products and services. Nothing herein should be construed as constituting an additional warranty. HP shall not be liable - HP Cluster Platform Hardware Kits v2010 | ProCurve 6400 CX4 Cable Management Kit - Page 3
in the Rear of the Rack 10 2.3 Installing the 3.5-Inch Straps...11 2.4 Installing the 5-Inch Straps...12 2.5 Cable Routing Examples...13 3 Removing the Switch for Servicing 15 Table of Contents 3 - HP Cluster Platform Hardware Kits v2010 | ProCurve 6400 CX4 Cable Management Kit - Page 4
List of Figures 1-1 Cable Management Bracket...6 1-2 3.5-Inch Fabric Strap...7 1-3 5-Inch Fabric Strap...7 2-1 Cable Management Bracket Orientation (Front of Rack 9 2-2 Cable Management Bracket Orientation (Rear of Rack 10 2-3 Attaching the 3.5-Inch Strap...12 2-4 Attaching the 5-Inch Strap...13 - HP Cluster Platform Hardware Kits v2010 | ProCurve 6400 CX4 Cable Management Kit - Page 5
List of Tables 1-1 Fasteners...8 5 - HP Cluster Platform Hardware Kits v2010 | ProCurve 6400 CX4 Cable Management Kit - Page 6
1.1 Audience This document is intended for HP service representatives and other persons trained to install hardware Platform Gigabit Ethernet Interconnect Guide 1.3 Kit Description The cable management bracket described in this document is designed to align and support cables that lead from an - HP Cluster Platform Hardware Kits v2010 | ProCurve 6400 CX4 Cable Management Kit - Page 7
columns of the HP 10000 Series Rack. The following list describes the callouts shown in Figure 1-1: 1. Cable management bracket (two brackets of the same type are included in each kit). 2. The mounting face, which contains three mounting slots. Attach the 3.5-inch fabric straps to this part of the - HP Cluster Platform Hardware Kits v2010 | ProCurve 6400 CX4 Cable Management Kit - Page 8
Table 1-1 Fasteners Qty. Size 8 M6 Cage Nuts 8 M6 x 16 mm Screws 8 10-32 Nuts 8 10-32 x 0.625 Screws Format Square Nut Phillips (Posidrive) Nut, Clip Phillips (Posidrive) Torque N/A 30 in/lb N/A 30 in/lb Description Cage nut for M6 x 16 mm screw. Machine screw, Phillips drive. For use with the - HP Cluster Platform Hardware Kits v2010 | ProCurve 6400 CX4 Cable Management Kit - Page 9
2 Installing the Cable Management Kit Chapter 2 includes the following sections: • Installing the Cable Management Bracket in the Front of the Rack (Section 2.1) • Installing the Cable Management Bracket in the Rear of the Rack (Section 2.2) • Installing the 3.5-Inch Straps (Section 2.3) • - HP Cluster Platform Hardware Kits v2010 | ProCurve 6400 CX4 Cable Management Kit - Page 10
Management Bracket in the Rear of the Rack Figure 2-2 shows the correct orientation of the cable management bracket in the rear of the rack to support the CX4 cables coming from the front of the HP ProCurve 6400cl switch. Note: The HP ProCurve 6400cl switch is installed in the rack with - HP Cluster Platform Hardware Kits v2010 | ProCurve 6400 CX4 Cable Management Kit - Page 11
The following list describes the callouts shown in Figure 2-2: 1. HP ProCurve 6400cl switch 2. HP ProCurve 1U rack mount slide rail 3. Thumb screw 4. Rack right column 5. Cable management bracket 6. Top and bottom HP ProCurve 1U slide rail kit mounting screws 7. Direction of view looking in from the - HP Cluster Platform Hardware Kits v2010 | ProCurve 6400 CX4 Cable Management Kit - Page 12
1. Position one of the 3.5-inch straps on the cable management bracket's mounting face, as shown in Figure 2-3, so that it is approximately adjacent to the CX4 connector ports in the cl module in the rear of the HP ProCurve 6400cl switch, and also for the CX4 connector ports on the front of the HP - HP Cluster Platform Hardware Kits v2010 | ProCurve 6400 CX4 Cable Management Kit - Page 13
2. Clip the 5-inch strap to the mounting hole (see callout 1 in Figure 2-4) on the cable management bracket. Figure 2-4 Attaching the 5-Inch Strap 1 2.5 Cable Routing Examples The vertical routing of the cable bundles depend on the HP Cluster Platform configuration. Regardless, the 5-inch straps - HP Cluster Platform Hardware Kits v2010 | ProCurve 6400 CX4 Cable Management Kit - Page 14
Figure 2-6 Cable Routing Example - Rear of Rack 1 14 Installing the Cable Management Kit - HP Cluster Platform Hardware Kits v2010 | ProCurve 6400 CX4 Cable Management Kit - Page 15
3 Removing the Switch for Servicing Bring the component to an appropriate state for removal, and put the rack cabinet into a the switch out from the front of the rack allows the CX4 cables to be supported in the rear cable management bracket straps while the switch is being repaired or replaced. 15 - HP Cluster Platform Hardware Kits v2010 | ProCurve 6400 CX4 Cable Management Kit - Page 16
*5991-7987* Printed in the US
HP Cluster Platform
ProCurve 6400 CX4 Cable Management
Kit Installation Guide
HP Part Number: 5991-7987
Published: July 2007