HP ML150 5U Tower G6 Server Hard Disk Drive Cage option Installation Instructi

HP ML150 - ProLiant - G6 Manual

HP ML150 manual content summary:

  • 1
  • 2

5U Tower G6 Server
Hard Disk Drive
Cage option
Installation Instructions
Legal notices
© Copyright 2009 Hewlett-Packard Development Company, L.P.
The information contained herein is subject to change without notice. The
only warranties for HP products and services are set forth in the express
warranty statements accompanying such products and services. Nothing
herein should be construed as constituting an additional warranty. HP shall
not be liable for technical or editorial errors or omissions contained herein.
Overview
This document contains instructions for installing a hot-plug hard disk
drive (HDD) cage.
For more information on preparing the server for installation, refer to
the documentation referenced on the HP Server product CD.
Kit contents
Hot-plug Hard disk drive (HDD) cage including backplane and
four hard drive blanks and cables.
Mounting hardware
HDD cage document
Important safety information
Read the installation instructions completely before beginning the
installation procedure. Refer to the document titled
Important Safety
Information
on the HP Server product CD.
CAUTION:
Electrostatic discharge (ESD) can damage
electronic components. Be sure you are properly
grounded (earthed) before beginning an installation
procedure.
Installation guidelines
This installation is to be performed by
qualified personnel who are
knowledgeable of the procedures, precautions, and hazards
associated with equipment containing hazardous energy circuits.
Detail system board configuration, please refer hood label
information.
Figure 1
Drive bay areas for servers shipped as non-hot-plug (left)
and hot-plug (right) systems
Item
Description
1
Upper hard drive area (bays1-4)
2
Lower hard drive area (bays 5-8)
NOTE:
1.
Both the upper or lower bay area can support a
hot-plug HDD cage.
2.
Before using the HDD cage, make sure a
750 w redundant power supply is installed on
the system.
Installing the HDD cage
1.
Shut down the operating system (OS) in an orderly manner.
2.
If necessary, press the power button to power down the server.
3.
Disconnect the external power cord(s) from the system chassis.
4.
If necessary, unlock the chassis.
5.
Loosen the thumbscrews and remove the access panel.
6.
Remove the front panel bezel.
7.
For a server pre-configured as a non-hot-plug system, remove
the 4 mounting screws for the shield covering the lower hard
drive area and remove the shield.
Figure 2
Removing the shield on a none-hot-plug system
8.
For a server pre-configured as a hot-plug system, remove the 4
mounting screws for the shield covering the lower hard drive
area and remove the shield.
Figure 3
Removing the shield on a hot-plug system
9.
If installing the HDD cage into the hard drive area, remove the
hard drive fan assembly as follows:
a.
Press the top tab toward the rear, lift the assembly up
slightly and it rotate away from the lower hard drive area.
b.
Lift the assembly away a short distance from the chassis.
c.
Disconnect the fan cable from system board connector.
and remove the hard drive fan holder assembly.
NOTE:
Fan location refer actual 5U tower Server Product.
Figure 4
Removing the hard drive fan holder assembly
10.
Slide the hot-plug HDD cage into the vacant HDD bay area
and secure with the 4 mounting screws.
Figure 5
Installing the hot-plug HDD cage
11.
Connect the power cables to the 4-pin connectors on the HDD
cage backplane (Figure 7).
12.
Connect the data cable from the system board or the
SATA/SAS card to the backplane (Figure 7).
13.
Connect the I2C cable from the system board I2C connector.
Part number 501531-001
March 2009 (First Edition)