Acer Aspire E1-521 Acer Aspire E1-521 Notebook Service Guide - Page 174

Touchpad FFC Installation, Installing the Touchpad Cable 1 of 2

Page 174 highlights

Touchpad FFC Installation 1. Connect the touchpad cable to the touchpad connector with the "TP" label side up. Flip the connector clip down to lock. Figure 5:111. Installing the Touchpad Cable (1 of 2) 2. Attach the protective tape to cover the touchpad cable connector. Figure 5:112. Installing the Touchpad Cable (2 of 2) 3. Install the upper case (see Upper Case Installation on page 5-38). 5-75 Service and Maintenance

We apologize, but we cannot currently deliver this PDF manual by request of the manufacturer.

We apologize for any inconveniece.