Acer TravelMate P245-M Shipping Document - Page 7

Test Requirements

Page 7 highlights

UN Test Data (Model:3UR18650-2-T0590) 1.Test Item: Vibration (T3) P.5/10 2.Test Purpose: This test simulates vibration during transport. 3.Test Procedure: Cells and batteries are firmly secured to the platform of the vibration machine without distorting the cells in such a manner as to faithfully transmit the vibration. The vibration shall be a sinusoidal waveform with a logarithmic sweep between 7 Hz and 200 Hz and back to 7 Hz traversed in 15 minutes.This cycle shall be repeated 12 times for a total of 3 hours for each of three mutually perpendicular mounting positions of the cell. One of the directions of vibration must be perpendicular to the terminal face. The logarithmic frequency sweep is as follows: from 7 Hz a peak acceleration of 1gn is maintained until 18 Hz is reached. The amplitude is then maintained at 0.8 mm(1.6 mm total excursion) and thefrequency increased until a peak acceleration of 8gn occurs (approximately 50Hz).A peak acceleration of 8 gn is then maintained until the frequency is increased to 200Hz. SANYO Internal Procedure: As above. 4.Test Requirements: No mass loss(less than 0.1%),no leakage,no venting,no disassembly,no rupture and no fire,and the voltage retention is not less than 90%. The requirement relating to voltage is not applicable to test batteries at fully discharged states. 5.Test Date: 2007/10/19 6.Test Data Battery No. Mass(g) Mass Voltage(V) Voltage loss (%) Retention( Before test After test (=90%) Other event Result Judgement At first 1 294.43 294.49 0.020 12.36 12.35 99.9 PASS cycle,in 2 293.65 293.69 0.014 12.36 12.35 99.9 fully charged 3 294.27 294.31 0.014 12.36 12.35 99.9 PASS PASS states 4 293.91 293.99 0.027 12.35 12.34 99.9 PASS At first 5 294.60 294.63 0.010 cycle,in 6 fully discharged 7 294.71 294.70 294.73 294.72 0.007 0.007 states 8 294.43 294.43 0.000 After 50 9 294.08 294.07 0.003 12.40 12.39 99.9 cycles ending in 10 294.65 294.61 0.014 12.40 12.39 99.9 fully 11 294.63 294.63 0.000 12.40 12.39 99.9 charged states 12 294.01 294.00 0.003 12.40 12.38 99.8 After 50 13 294.50 294.50 0.000 cycles ending in 14 294.56 294.54 0.007 fully 15 294.10 discharged states 16 294.32 294.07 294.32 0.010 0.000 Notes: L-Leakage, V-Venting, D-Disassembly, R-Rupture, F-Fire, 0-No leakage, no venting, no disassembly, no rupture & no fire PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12

UN Test Data
(Model:3UR18650-2-T0590)
1.Test Item:
Vibration (T3)
P.5/10
2.Test Purpose:
This test simulates vibration during transport.
3.Test Procedure:
Cells and batteries are firmly secured to the platform of the vibration machine without distorting the cells in such a
manner as to faithfully transmit the vibration. The vibration shall be a sinusoidal waveform with a logarithmic sweep
between 7 Hz and 200 Hz and back to 7 Hz traversed
in 15 minutes.This cycle shall be repeated 12 times for a
total of 3 hours for each of
three mutually perpendicular mounting positions of the cell. One of the directions of
vibration must be perpendicular to the terminal face.
The logarithmic frequency sweep is as follows: from 7 Hz a peak acceleration of 1gn is maintained until 18 Hz is
reached. The amplitude is then maintained at 0.8 mm(1.6 mm total excursion) and thefrequency increased until a
peak acceleration of 8gn occurs (approximately 50Hz).A peak acceleration of 8 gn is then maintained until the
frequency
is increased to 200Hz.
SANYO Internal Procedure:
As above.
4.Test Requirements:
No mass loss(less than 0.1%),no leakage,no venting,no disassembly,no rupture and no fire,and the voltage
retention is not
less than 90%.
The requirement relating to voltage is not applicable to test batteries at fully discharged states.
5.Test Date:
2007/10/19
6.Test Data
Before test
After test
Before test
After test
1
294.43
294.49
0.020
12.36
12.35
99.9
0
PASS
2
293.65
293.69
0.014
12.36
12.35
99.9
0
PASS
3
294.27
294.31
0.014
12.36
12.35
99.9
0
PASS
4
293.91
293.99
0.027
12.35
12.34
99.9
0
PASS
5
294.60
294.63
0.010
0
PASS
6
294.71
294.73
0.007
0
PASS
7
294.70
294.72
0.007
0
PASS
8
294.43
294.43
0.000
0
PASS
9
294.08
294.07
0.003
12.40
12.39
99.9
0
PASS
10
294.65
294.61
0.014
12.40
12.39
99.9
0
PASS
11
294.63
294.63
0.000
12.40
12.39
99.9
0
PASS
12
294.01
294.00
0.003
12.40
12.38
99.8
0
PASS
13
294.50
294.50
0.000
0
PASS
14
294.56
294.54
0.007
0
PASS
15
294.10
294.07
0.010
0
PASS
16
294.32
294.32
0.000
0
PASS
Notes: L-Leakage, V-Venting, D-Disassembly, R-Rupture, F-Fire,
0-No leakage, no venting, no disassembly, no rupture & no fire
Voltage(V)
Voltage
Retention(
%)(=>90%)
Other
event
Result
Judgement
At first
cycle,in
fully
charged
states
PASS
At first
cycle,in
fully
discharged
states
After 50
cycles
ending in
fully
charged
states
After 50
cycles
ending in
fully
discharged
states
Battery No.
Mass(g)
Mass
loss (%)
(=<0.1%)