BenQ PB2120 User Manual - Page 17
Operation, Start Up
UPC - 840046004149
View all BenQ PB2120 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 17 highlights
Operation Start Up 1. Plug the power cord into a wall socket. 2. Press and hold POWER for 1 second. The back-lit POWER key blinks green and stays green when the power is turned on. When the power is turned off, there is a 90-second cooling period before the projector can be re-started. 3. Switch on all connected equipment. Operation 13
Operation
13
Operation
Start Up
1.
Plug the power cord into a wall socket.
2.
Press and hold
POWER
for 1 second.
The back-lit POWER key blinks green and stays green when the power is turned on.
When the power is turned off, there is a 90-second cooling period before the projector can be
re-started.
3.
Switch on all connected equipment.