BenQ PB2120 User Manual - Page 17

Operation, Start Up

Page 17 highlights

Operation Start Up 1. Plug the power cord into a wall socket. 2. Press and hold POWER for 1 second. The back-lit POWER key blinks green and stays green when the power is turned on. When the power is turned off, there is a 90-second cooling period before the projector can be re-started. 3. Switch on all connected equipment. Operation 13

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36

Operation
13
Operation
Start Up
1.
Plug the power cord into a wall socket.
2.
Press and hold
POWER
for 1 second.
The back-lit POWER key blinks green and stays green when the power is turned on.
When the power is turned off, there is a 90-second cooling period before the projector can be
re-started.
3.
Switch on all connected equipment.