Brother International BE-1204C Maintenance Schedule - English
Brother International BE-1204C Manual
View all Brother International BE-1204C manuals
Add to My Manuals
Save this manual to your list of manuals |
Brother International BE-1204C manual content summary:
- Brother International BE-1204C | Maintenance Schedule - English - Page 1
BE-1204, 1206 For Technical Assistance Please Call Toll Fre e 1-877-4BROTHER Email: [email protected] Website: http://www.brother-usa Oiling Rotary hook 1. Remove rubber dust plug from the left hand end of machine and insert the red 4mm T-handle wrench. Turn degree wheel in the opposite - Brother International BE-1204C | Maintenance Schedule - English - Page 2
://www.brother-usa.com/industembroidery/tech_down.aspx Weekly Maintenance Oiling Needle Bars 1. Insert 1 drop of oil to each needle bar through Felt pad on heads 1. Remove rubber dust plugs to the right of each head. each hole in the needle case cover. Do this for all Color change machine to - Brother International BE-1204C | Maintenance Schedule - English - Page 3
BE-1204, 1206 For Technical Assistance Please Call Toll Fre e 1-877-4BROTHER Email: [email protected] Website: http://www.brother-usa.com/industembroidery/tech_down.aspx Monthly Maintenance Cleaning Knives Control Box 1. Remove the two rear screws and remove the 1. Use a brush to clean - Brother International BE-1204C | Maintenance Schedule - English - Page 4
Fre e 1-877-4BROTHER Email: [email protected] Website: http://www.brother-usa.com/industembroidery/tech_down.aspx Monthly Maintenance Oiling Front lower shaft bushing 1. Lubricate the front lower shaft bushing by adding oil to the red hole for each head. Rear lower shaft bushing 1. Lubricate - Brother International BE-1204C | Maintenance Schedule - English - Page 5
BE-1204, 1206 For Technical Assistance Please Call Toll Fre e 1-877-4BROTHER Email: [email protected] Website: http://www.brother-usa.com/industembroidery/tech_down.aspx Monthly Maintenance Greasing Cam grooves 1. Remove the covers between each head by 3. Remove the right end cover by - Brother International BE-1204C | Maintenance Schedule - English - Page 6
Email: [email protected] Website: http://www.brother-usa.com/industembroidery/tech_down.aspx Monthly Maintenance Greasing Cam grooves continued 5. Unscrew the lower screw [2] and loosen the upper 7. Grease the cam groove of the work clamp cams. fixing screw [3]. Remove the head front covers - Brother International BE-1204C | Maintenance Schedule - English - Page 7
Call Toll Fre e 1-877-4BROTHER Email: [email protected] Website: http://www.brother-usa.com/industembroidery/tech_down.aspx Monthly Maintenance Greasing Cam grooves continued 11. Move the needle bar case to the needle bar No.1 15. Install left end head cover. position by rotating the color - Brother International BE-1204C | Maintenance Schedule - English - Page 8
877-4BROTHER Email: [email protected] Website: http://www.brother-usa.com/industembroidery/tech_down.aspx 3 Month Maintenance Greasing Driving shaft Needle bar flip-up mechanism 1. Unscrew four screws fixing the table cover L, and 1. Unscrew three screws fixing the head cover R, and remove - Brother International BE-1204C | Maintenance Schedule - English - Page 9
Toll Fre e 1-877-4BROTHER Email: [email protected] Website: http://www.brother-usa.com/industembroidery/tech_down.aspx 3 Month Maintenance Greasing Lower gear 1. Unscrew the 4 flat head screws fixing the bed cover B, and remove the bed covers B. Feed Guide Section 1. Unscrew the screw [1] and
4/8/05
1
Daily Maintenance
e
li
Cl anin
g
Oi ng
Rotary hook
1.
Open bobbin case covers and remove bobbin
cases. Use brush to remove lint build up in and
around rotary hooks. Compressed air may also
be used.
2.
Insert bobbin cases in to rotary hooks. Make
sure bobbin thread is not over 2 inches long.
Close bobbin case covers.
Rotary hook
1.
Remove rubber dust plug from the left hand end of
machine and insert the red 4mm T-handle wrench.
Turn degree wheel in the opposite direction of the
arrow to 50 degrees.
2.
Open bobbin case covers and insert one drop of oil
to the rotary hook raceways. Oil raceways at the
beginning and every 3-4 hours of operation.
3. Close bobbin case covers.
4.
Rotate degree wheel in the direction of the arrow
back to stop position (100 degrees). Remove T-
handle wrench and re-install rubber dust plug.
For Technical Assistance Please Call Toll Free
1-877-4BROTHER
Email:
Website
:
B
B
E
E
-
-
1
1
2
2
0
0
4
4
,
,
1
1
2
2
0
0
6
6