Brother International BES-1261BC Maintenance Schedule - English - Page 6
Brother International BES-1261BC Manual
View all Brother International BES-1261BC manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 6 highlights
BES-940,941,1240,1241 960,961,962,963,1260,1261,1262,1263 For Technical Assistance Please Call Toll Fre e 1-877-4BROTHER Email: [email protected] Website: http://www.brother-usa.com/industembroidery/tech_down.aspx Monthly Maintenance Greasing Cam grooves continued 9. Remove presser foot guide plates and unhook 11. Hook the spring to the back of the presser foot springs located on the back. guide plate and reinstall the plate leaving the screws loose. Make sure that the shaft clamp of the presser foot goes into the guide on the plate. The retracting lever should be underneath the shaft clamp. Before final tightening of the screws, please check the alignment of the presser foot to the needle plate and make sure that the presser foot goes up and down smoothly. Do this for all of the heads. 10. Using the black grease, grease the work clamp cam for each head. 12. Manually color change to needle 5 if it is a 9 needle machine or 6 if it is a 12 needle machine. Reinstall head covers, right cover on head 1 and left cover on head 6. 5/24/05 6