Cisco 6503-E User Guide - Page 81
Predeploying Subchassis Modules, Predeployed Catalyst 6509 Chassis Object
View all Cisco 6503-E manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 81 highlights
Chapter 4 Deploying the C65/76M Figure 4-25 Predeployed Catalyst 6509 Chassis Object Deployment and Commissioning Process Predeploying Subchassis Modules The next step in predeploying a Catalyst 6000 family switch or a Cisco 7600 series Internet Router in CEMF is to deploy the modules within the chassis. The following subchassis objects can be predeployed: • Supervisor Modules • Ethernet Modules • Switch Fabric Modules • FlexWAN Modules • Port Adapters • Optical Services Modules • Content Switching Module Tip Supporting modules, such as AC or DC power supplies, are automatically added through subchassis discovery. You cannot manually deploy these objects. Cisco 6500/7600 Series Manager User Guide 4-31
4-31
Cisco 6500/7600 Series Manager User Guide
Chapter 4
Deploying the C65/76M
Deployment and Commissioning Process
Figure 4-25
Predeployed Catalyst 6509 Chassis Object
Predeploying Subchassis Modules
The next step in predeploying a Catalyst 6000 family switch or a Cisco 7600 series Internet Router in
CEMF is to deploy the modules within the chassis. The following subchassis objects can be predeployed:
•
Supervisor Modules
•
Ethernet Modules
•
Switch Fabric Modules
•
FlexWAN Modules
•
Port Adapters
•
Optical Services Modules
•
Content Switching Module
Tip
Supporting modules, such as AC or DC power supplies, are automatically added through subchassis
discovery. You cannot manually deploy these objects.