D-Link DGS-1024D Product Manual - Page 20

Before You Connect to the Network. - no power

Page 20 highlights

Before You Connect to the Network. The site where you install the Switch may greatly affect its performance. Please follow these guidelines for setting up the Switch. • Install the Switch on a sturdy, level surface that can support at least 3 kg (6.6 lbs) of weight. Do not place heavy objects on the Switch. • The power outlet should be within 1.82 meters (6 feet) of the Switch. • Visually inspect the power cord and see that it is fully secured to the AC power port. • Make sure that there is adequate space for proper heat dissipation from and adequate ventilation around the Switch. Leave at least 10 cm (4 inches) of space at the front and rear of the Switch for ventilation. • Install the Switch in a fairly cool and dry place for the acceptable temperature and humidity operating ranges. • Install the Switch in a site free from strong electromagnetic field generators (such as motors), vibration, dust, and direct exp osure to sunlight. • When installing the Switch on a level surface, attach the rubber feet to the bottom of the device. The rubber feet cushion the Switch, protect the casing from scratches and prevent it from scratching other surfaces. 20

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41

20
Before You Connect to the Network.
The site where you install the Switch may greatly affect its performance.
Please follow these guidelines for setting up the Switch.
Install the Switch on a sturdy, level surface that can support at
least 3 kg (6.6 lbs) of weight. Do not place heavy objects on the
Switch.
The power outlet should be within 1.82 meters (6 feet) of the
Switch.
Visually inspect the power cord and see that it is fully secured to
the AC power port.
Make sure that there is adequate space for proper heat dissipation
from and adequate ventilation around the Switch. Leave at least
10 cm (4 inches) of space at the front and rear of the Switch for
ventilation.
Install the Switch in a fairly cool and dry place for the acceptable
temperature and humidity operating ranges.
Install the Switch in a site free from strong electromagnetic field
generators (such as motors), vibration, dust, and direct exp osure
to sunlight.
When installing the Switch on a level surface, attach the rubber
feet to the bottom of the device. The rubber feet cushion the
Switch, protect the casing from scratches and prevent it from
scratching other surfaces.