GE PSCS3RGXSS Use and Care Manual - Page 31
REPLACE THE BASE GRILLE, SET THE CONTROLS, START THE ICEMAKER, days to fill the ice bin.
UPC - 084691168119
View all GE PSCS3RGXSS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 31 highlights
Installation Instructions 7 REPLACE THE BASE GRILLE Replace the grille by installing the two Phillips head screws. 9 START THE ICEMAKER Set the icemaker power switch to the I (on) position. The icemaker will not begin to operate until it reaches its operating temperature of 15°F (-9°C) or below. It will then begin operation automatically. It will take 2-3 days to fill the ice bin. 8 SET THE CONTROLS Set the controls to the recommended setting. Power switch NOTE: In lower water pressure conditions, the water valve may turn on up to 3 times to deliver enough water to the icemaker. 31
31
Installation Instructions
REPLACE THE BASE GRILLE
Replace the grille by installing the two Phillips
head screws.
7
SET THE CONTROLS
Set the controls to the recommended setting.
8
START THE ICEMAKER
Set the icemaker power switch to the
I (on)
position. The icemaker will not begin to operate
until it reaches its operating temperature
of 15°F (–9°C) or below. It will then begin
operation automatically. It will take 2–3
days to fill the ice bin.
NOTE:
In lower water pressure conditions, the water
valve may turn on up to 3 times to deliver
enough water to the icemaker.
9
Power
switch