Haier 2HUM14HB03 User Manual - Page 4
R410A
View all Haier 2HUM14HB03 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 4 highlights
5. No gas leakage? In case of gas leakage, tighten parts of pipe connection. If leakage stops, then proceed 6. steps If it does not stop gas leakage, discharge whole refrigerants from the service port. After flaring work again and vacuumize, fill up prescribed refrigerant from the gas cylinder. 6. Detach the charge hose from the service port, open 2-way valve and 3-way. Turn the valve rod anticlockwise until hitting lightly. 7.To prevent the gas leakage, turn the service port's cap, the valve rod's cap for 2-way valve and 3-way's a little more than the point where the torque increases suddenly. 8. After attaching the each caps, check the gas leakage around the caps. Step 1. 2-way valve Liquid Side 3-way valve Gas Side Step 2. Open Gaugemanifold(for R410A) Anti countercurrent joint Step 3. Vacuum pump(for R410A) Tube(for R410A) Close Step 4. Open 90O 2-way valve 3-way valve Step 6. 2-way valve 3-way valve 2-way valve 3-way valve 2-way valve 3-way valve Step 7. 2-way valve 3-way valve Valve rod cap Service port cap Valve rod cap CAUTION ƽ Each indoor unit musts to be vacuumed , according to the above steps. ƽ If the refrigerant of the air conditioner leaks, it is necessary to discharge all the refrigerant. Vacuumize first, then charge the liquid refrigerant into air conditioner according to the amount marked on the name plate. ƽ Please do not let other cooling medium, except specified one (R410A), or air enter into the cooling circulation system. Otherwise, there will be abnormal high pressure in the system to make it crack and lead to personal injuries. Power Source Installation ƽ The power source must be exclusively used for air conditioner. (Over I0A) ƽ In the case of installing an air conditioner in a moist place, please install an ea- rth leakage breaker. ƽ For installation in other places, use a circuit breaker as far as possible. Cutting and Flaring Work of Piping ƽ Pipe cutting is carried out with a pipe cutter and burs must be removed. ƽ After inserting the flare nut, flaring work is carried out. Flare tool for R410A Conventional flare tool Clutch-type clutch-type(Rigid-type) Wing-nut type (Imperial-type) A 0~0.5mm 1.0~1.5mm 1.5~2.0mm Flare tooling die 1.Cut pipe 2.Remove burs 3.Insert the flare nut 4.Flare pipe On Drainage ƽ Please install the drain hose so as to be downward slope without fail. ƽPlease don't do the drainage as shown below. Less than 5cm It becomes The end is imm- It waves. The gap with the There is the bad high midway. ersed in water. ground is too small. smell from a ditch ƽPlease pour water in the drain pan of the indoor unit, and confirm that drainage is carried out surely to outdoor. ƽ In case that the attached drain hose is in a room, please apply heat insulation to it without fail. Ƶ Refrigerant charge label Contains fluorinated greenhouse gases covered by the Kyoto Protocol A R410A 1= 2 2= 1 kg B kg C 1+2= kg D FE This product contains fluorinated greenhouse gases covered by the Kyoto Protocol. Do not vent into the atmosphere. Refrigerant type:R410A GWP* value:1975 GWP=global warming potential Please fill in with indelible ink, • 1 the factory refrigerant charge of the product • 2 the additional refrigerant amount charged in the field and • 1+2 the total refrigerant charge on the refrigerant charge label supplied with the product. The filled out label must be adhered in the proximity of the product charging port (e.g. onto the inside of the stop value cover). A contains fluorinated greenhouse gases covered by the Kyoto Protocol B factory refrigerant charge of the product: see unit name plate C additional refrigerant amount charged in the field D total refrigerant charge E outdoor unit F refrigerant cylinder and manifold for charging Ƶ Check for Installation and Test Run Ƶ Please kindly explain to our customers how to operate through the instruction manual. Check Items for Test Run Put check mark in boxes Gas leak from pipe connecting? Heat insulation of pipe connecting? Are the connecting wirings of indoor and outdoor firmly inserted to the terminal block? Is the connecting wiring of indoor and outdoor firmly fixed? Is drainage securely carried out? Is the earth line securely connected? Is the indoor unit securely fixed? Is power source voltage abided by the code? Is there any noise? Is the lamp normally lighting? Are cooling and heating (when in heat pump) performed normally? Is the operation of room temperature regulator normal? Correct Incorrect Lean Damage of flare Crack Partial Too outside 4