Haier AB122ACBHA User Manual - Page 25

Check and Test Run

Page 25 highlights

Check and Test Run Other Instructions 1.Configuration of power supply Air conditioner must use special power supply system (above 20A), and qualified electrician makes wiring and fixing according to wiring regulations specified in national standard. In socket, exactly distinguish earth wire with neutral wire and it is wrong to connect them together. A leakage breaker must be installed. Parameters of power supply: H07RN-F 3G 2.0mm2 Connection method is Y-connection .If the power cord is damaged, it must be replaced by professional people of manufacturer or its maintenance department or similar to avoid dangers. 2.Pipe cutting and expanding Must remove burrs if cut pipes with pipe cutter. Expand flare after insert the pipe expander. Liquid pipe Gas pipe Diameter of pipe 6.35mm (1/4î) 12.7mm (1/2î) Dimension A (mm) 0.8~1.5 1.0~2.0 A Pipe expander Correct Incorrect Deflection Crack occurs Broken Incomplete Over outward Installation check and test run Require customers to use air conditioner according to the operation manual. The items checked during test run,please mark in No gas leakage on the pipe joint ? How about the thermal insulation of the pipe joint: Is the electrical wiring between indoor and outdoor unit connected to the terminal block firmly? Is the wiring of indoor and outdoor unit secured firmly? Is the drainage hose arranged correct? Is the earthing wire connected firmly? Is the power supply voltage conformed to the electrical regulation? Any noise? Is the display on the control board (LCD) correct? Cooling normal? Does the indoor temperature regulator work normally? For the power supply 1 shall be connected to the live wire. 2 shall be connected to the neutral wire. Shall be connected to the earth wire. 23

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26

Correct
Incorrect
A
Pipe expander
Other Instructions
1.Configuration of power supply
Air conditioner must use special power supply system (above 20A), and qualified electrician makes
wiring and fixing according to wiring regulations specified in national standard.
In socket, exactly distinguish earth wire with neutral wire and it is wrong to connect them together.
A leakage breaker must be installed.
Parameters of power supply: H07RN-F 3G 2.0
mm
2
Connection method is Y-connection .If the power cord is damaged, it must be replaced by
professional people of manufacturer or its maintenance department or similar to avoid dangers.
2.Pipe cutting and expanding
Must remove burrs if cut pipes with pipe cutter.
Expand flare after insert the pipe expander.
Liquid pipe
Gas pipe
Diameter of pipe
Dimension A (mm)
0.8~1.5
1.0~2.0
6.35mm (1/4î)
12.7mm (1/2î)
Deflection
Crack occurs
Broken
Incomplete
Over outward
Installation check and test run
Require customers to use air conditioner according to the operation manual.
The items checked during test run,please mark
in
No gas leakage on the pipe joint ?
How about the thermal insulation of the pipe joint:
Is the electrical wiring between indoor and outdoor unit connected to the terminal block firmly?
Is the wiring of indoor and outdoor unit secured firmly?
Is the drainage hose arranged correct?
Is the earthing wire connected firmly?
Is the power supply voltage conformed to the electrical regulation?
Any noise?
Is the display on the control board (LCD) correct?
Cooling normal?
Does the indoor temperature regulator work normally?
For the power supply
1
shall be connected to the live wire.
2
shall be connected to the neutral wire.
Shall be connected to the earth wire.
23
Check and Test Run