Haier AB142FCBHA User Manual - Page 18
Preparation For The Installation
View all Haier AB142FCBHA manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 18 highlights
Installation Procedure 33. PREPARATION FOR THE INSTALLATION (1) Position of ceiling opening between unit and suspending bolt. Overlap between ceiling and ornament panel shall be 15mm Suspending bolts 630(Ornament panel) 600(Ceiling opening) 570(Indoor unit) Distance between suspending bolts 460mm Ceiling Ornament panel 570(Indoor unit) 600(Ceiling opening) 630(Ornament panel) (2) Cut an opening in ceiling for installation if necessary. (when ceiling already exists.) Refer to paper pattern for dimension of ceiling hole. Connect all pipings (refrigerant, water drainage), wirings (inter unit cable) to indoor unit, before installation. Cut a hole in ceiling, may be a frame should be used to ensure a smooth surface and to prevent vibration. Contact your real estate dealer (3) Install a suspending bolt. (Use a M10 bolt) To support the unit weight, anchor bolt shall be used in the case of already exists ceiling. For new ceiling, use built-in type bolt or parts prepared in the field. Before going on installing adjust space between ceiling. 50~100 Roof Anchor bolt Long nut Suspending bolt Ceiling Note: All the above mentioned parts shall be prepared in field. 16