Haier ESA418K User Manual - Page 6

Prepare Window for Installation, Position Air Conditioner - model

Page 6 highlights

NOTE: Cover putty knife blade with masking tape to guard against damage of the unit finish. Prepare Window for Installation 1. Measure the width of the window opening. 2. Mark the center line on the inside windowsill. A CAUTION: Never expose plastic front or grille to extreme temperatures. Assemble Curtain/Top channel NOTE: Attach curtains to the air conditioner before placing the air conditioner in window. 1. Install top channel with four 13/32" screws. 2. Slide left-hand curtain assembly into left end of top and bottom channels. Repeat for right-hand curtain assembly. 3. Fasten curtain retainer strips to the sides of the outer case with eight 13/32" screws.. B A. Width of window opening B. Center line Position Air Conditioner AB C D A. Top channel B. 13/32" screws C. 13/32" screws D. Side curtains NOTES: Handle the air conditioner gently. Be sure your air conditioner does not fall out of the opening during installation or removal. The place where the power cord exits the air conditioner should be no more than 4 ft (122 cm) from a grounded outlet. Do not block the louvers in the front panel. Do not block the louvers on the outside of the air conditioner. B A C A. Side curtain against window channel B. Window sash behind top channel C. Bottom channel in behind windowsill NOTE: Your model may differ from the one shown. 6

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44

B
A
A
B
C
D
A
B
C
NOTE: Cover putty knife blade with masking tape to guard
against damage of the unit finish.
CAUTION:
Never expose plastic front or grille to extreme temperatures.
NOTE:
Attach curtains to the air conditioner before placing the air
conditioner in window.
1.
Install top channel with four 13/32” screws.
2.
Slide left-hand curtain assembly into left end of top and bottom
channels. Repeat for right-hand curtain assembly.
3.
Fasten curtain retainer strips to the sides of the outer case with
eight 13/32” screws..
NOTES:
Handle the air conditioner gently.
Be sure your air conditioner does not fall out of the opening
during installation or removal.
The place where the power cord exits the air conditioner
should be no more than 4 ft (122 cm) from a grounded outlet.
Do not block the louvers in the front panel.
Do not block the louvers on the outside of the air conditioner.
NOTE:
Your model may differ from the one shown.
A. Side curtain against window channel
B. Window sash behind top channel
C. Bottom channel in behind windowsill
Prepare Window for Installation
1.
Measure the width of the window opening.
2.
Mark the center line on the inside windowsill.
Position Air Conditioner
A.
Top channel
B.
13/32” screws
C.
13/32” screws
D.
Side curtains
A. Width of window opening
B. Center line
Assemble Curtain/Top channel
6