Haier HB6000VD1M22-EP User Manual - Page 7

Air Handler is factory ready for Upflow & Horizontal Right Discharge Application

Page 7 highlights

AIR FLOW ORIENTATION *Horizontal Right Discharge Tube and Drain conn. front Horizontal Left Discharge Tube and Drain conn. front (see page 6) Important: Remove the horizontal pan when unit is installed in unconditioned i.e. (Garage, Attic ) application, or downflow applications, and install insulation kit on vertical ( donut shape ) drain pan. *Upflow Discharge *Air Handler is factory ready for Upflow & Horizontal Right Discharge Application for 3*4*5 as shown. *Air Handler is factory ready for Upflow & Horizontal Left Discharge Application for 2 as shown. 7

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16

AIR FLOW ORIENTATION
*Horizontal Right Discharge
Tube and Drain conn. front
Horizontal Left Discharge
Tube and Drain conn. front
(see page 6)
Important:
Remove the horizontal pan when
unit is installed in unconditioned
i.e. (Garage, Attic ) application,
or downflow applications, and
install insulation kit on vertical
( donut shape ) drain pan.
*Upflow Discharge
*Air Handler is factory ready for Upflow & Horizontal Right Discharge Application for
3
*4*5
as shown.
*Air Handler is factory ready for Upflow & Horizontal
Left
Discharge Application for 2 as shown.
7