Haier HR36D2VAR User Manual - Page 11

Refrigerant, Metering Devices, Table 4

Page 11 highlights

1.Tubing should be cut square. Make sure it is round and free of burrs at the connecting ends. Clean the tubing to prevent contamination from entering the system. 2.Make sure that both refrigerant stop valves at the outdoor unit are closed. 3.Push the tubing into the fitting until it stops. This prevents flux from getting into the system. 4.Remove the cap and Schrader valve core from the service port to protect the valve seals. 5.Wrap a wet rag around the valve stub before brazing. 6.Braze the joints of interconnecting tubing. Flow dry nitrogen into the shutoff valve port and through the tubing while brazing. 7.After brazing quench with a wet rag to cool the joint. Reinstall the Schrader core in the valve, if removed for brazing. 8.Pressurize the lines to 150 psi maximum with dry nitrogen. Check for leaks at all joints with liquid detergent. If a leak is found, repair it after removing the nitrogen. Repeat the process and re-ckeck. 9.Do not purge the lines with refrigerant. Evacuate the lines and indoor coil. Refrigerant Metering Devices Replace the existing indoor unit fixed orifice with the orifice supplied with the outdoor unit. See table 4 for the fixed orifice size for each unit. Table 4 outdoor model HR18D2VAR HR24D2VAR HR30D2VAR HR36D2VAR Fixed orifice size indoor model HB2400VD1M20 HB2400VD1M20 HB3600VD1M22 HB3600VD1M22 orifice size 057 065 071 078 9

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18

9
1.Tubing should be cut square. Make sure it is round and free of burrs at the connecting ends.
Clean the tubing to prevent contamination from entering the system.
2.Make sure that both refrigerant stop valves at the outdoor unit are closed.
3.Push the tubing into the fitting until it stops. This prevents flux from getting into the system.
4.Remove the cap and Schrader valve core from the service port to protect the valve seals.
5.Wrap a wet rag around the valve stub before brazing.
6.Braze the joints of interconnecting tubing. Flow dry nitrogen into the shutoff valve port
and through the tubing while brazing.
7.After brazing quench with a wet rag to cool the joint. Reinstall the Schrader core in the valve,
if removed for brazing.
8.Pressurize the lines to 150 psi maximum with dry nitrogen. Check for leaks at all joints with
liquid detergent. If a leak is found, repair it after removing the nitrogen. Repeat the process
and re-ckeck.
9.Do not purge the lines with refrigerant. Evacuate the lines and indoor coil.
Refrigerant
Metering Devices
Replace the existing indoor unit fixed orifice with the orifice supplied with the outdoor unit.
See table 4 for the fixed orifice size for each unit.
Table 4
outdoor model
indoor model
orifice size
HR18D2VAR
HB2400VD1M20
057
HR24D2VAR
HB2400VD1M20
06
5
HR30D2VAR
HB3600VD1M22
071
HR36D2VAR
HB3600VD1M22
07
8
Fixed orifice size