Haier HWR06XCR User Manual - Page 12

Unpacking The Air Conditioner, Preparing The Air Conditioner

Page 12 highlights

ENGLISH UNPACKING THE AIR CONDITIONER WARNING EXCESSIVE WEIGHT HAZARD When moving or lifting the air conditioner, use two or more people. Wear gloves when handling the air conditioner to protect against possible sharp edges and metal fins. REMOVE PACKAGING MATERIALS • Remove packaging materials. Save the carton and the foam packaging for storing the unit when not in use. NOTE: There are NO internal packing materials inside the air conditioner to remove―Do Not open the cabinet. • Handle the air conditioner gently. • Keep the air conditioner upright and level. Do not set the air conditioner on its side, front, back or upside down. • The air conditioner must be standing upright for 2 hours prior to installation and operation. PREPARING THE AIR CONDITIONER INSTALL TOP CHANNEL Front Fig. 7 3/8" Screw (Actual Size) Top Channel 1. Place the top channel on the top of the air conditioner, lining up the holes in the top channel with the holes in the top of the unit. Make sure the channel is facing forward as indicated by the illustrations. (See Fig.7 & 8) 2. Using 3/8" self-tapping screws, attach the top channel to the top of the air conditioner. (See Fig.8) Use three (3) 3/8" self-tapping screws for models: HWR05XCR, HWR06XCR Use four (4) 3/8" self-tapping screws for models: HWE08XCR, HWE10XCR, HWE12XCR, HWR08XCR, HWR10XCR, HWR12XCR PAGE 10 HOW TO INSTALL Fig. 8

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80

REMOVE PACKAGING MATERIALS
Remove
packaging
materials.
Save
the
carton
and
the
foam
packaging
for
storing
the
unit
when
not
in
use.
NOTE:
There
are
NO
internal
packing
materials
inside
the
air
conditioner
to
r
emove―Do
No
t
open
the
cabinet.
Handle
the
air
conditioner
gently.
Keep
the
air
conditioner
upright
and
level.
Do
not
set
the
air
conditioner
on
its
side,
front,
back
or
upside
down.
The
air
conditioner
must
be
standing
upright
for
2
hours
prior
to
installation
and
oper
ation.
INSTALL TOP CHANNEL
1.
Place
the
top
channel
on
the
top
of
the
air
conditioner,
lining
up
the
holes
in
the
top
channel
with
the
holes
in
the
top
of
the
unit.
Make
sure
the
channel
is
facing
forward
as
indicated
by
the
illustr
ations.
(See Fig.7 & 8)
2.
Using
3/8"
self-tapping
screws,
attach
the
top
channel
to
the
t
op
of the air
c
onditioner.
(See Fig.8)
Use three (3) 3/8" self-tapping screws for models:
HWR05XCR, HWR06XCR
Use four (4) 3/8" self-tapping screws for models:
HWE08XCR, HWE10XCR, HWE12XCR, HWR08XCR, HWR10XCR,
HWR12XCR
UNPACKING THE AIR CONDITIONER
PREPARING THE AIR CONDITIONER
ENGLISH
EXCESSIVE WEIGHT HAZARD
When
moving
or
lifting
the
air
conditioner,
use
two
or
more
people.
Wear
gloves
when
handling
the
air
conditioner
to
protect
against
possible
sharp
edges
and
metal
fins.
WARNING
PAGE 10
HOW TO INSTALL
Fig. 7
Fig. 8
Top
Channel
3/8"
Screw
(Actual
Size)
Front