HP DL785 3-7U Quick Deploy Rail System Installation Instructions - Page 9

Preparing the product for rack relocation or integrated sh

Page 9 highlights

Preparing the product for rack relocation or integrated shipping Return to step 1 in "Installing the product in a rack." To service or remove the product from the rack, reverse the procedures in this section: 1. Remove the rear slide locking screw and the front rail locking screws. Retain the screws for future use. 2. Cut and discard the orange tie wraps.

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10

Return to step 1 in "Installing the product in a rack."
Preparing the product for
rack relocation or
integrated shipping
To service or remove the product from the rack, reverse the
procedures in this section:
1.
Remove the rear slide locking screw and the front rail
locking screws. Retain the screws for future use.
2.
Cut and discard the orange tie wraps.