HP ProLiant BL660c HP BladeSystem c-Class Onboard Administrator Failover
HP ProLiant BL660c Manual
View all HP ProLiant BL660c manuals
Add to My Manuals
Save this manual to your list of manuals |
HP ProLiant BL660c manual content summary:
- HP ProLiant BL660c | HP BladeSystem c-Class Onboard Administrator Failover - Page 1
HP BladeSystem c-Class Onboard Administrator Failover Understanding the Active-Standby Transition Process Technical white paper Table of contents Purpose of this White Paper ...2 OA Failover Process - HP ProLiant BL660c | HP BladeSystem c-Class Onboard Administrator Failover - Page 2
Purpose of this White Paper HP c-Class BladeSystem Onboard Administrators (OA) are frequently configured in pairs to provide fault tolerance of the enclosure management. This white paper describes the interaction of - HP ProLiant BL660c | HP BladeSystem c-Class Onboard Administrator Failover - Page 3
and wait for a power off event to occur (VC parameters cannot be written to the server if it is powered up). In VC firmware prior to v3.30, server connectivity will be disconnected in the Profile Pending state. In the VC firmware v3.30 or later, Profile Pending state will not affect connectivity - HP ProLiant BL660c | HP BladeSystem c-Class Onboard Administrator Failover - Page 4
OA Failover Testing - Recommendations Validate status and allow appropriate recovery time In order to obtain valid results for repeated, back-to-back OA failover testing, wait at least 7 minutes before initiating each OA "force failover" command. In addition, if the enclosure is configured for - HP ProLiant BL660c | HP BladeSystem c-Class Onboard Administrator Failover - Page 5
to change without notice. The only warranties for HP products and services are set forth in the express warranty statements accompanying such products and services. Nothing herein should be construed as constituting an additional warranty. HP shall not be liable for technical or editorial errors
HP BladeSystem c-Class Onboard Administrator Failover
Understanding the Active-Standby Transition Process
Technical white paper
Table of contents
Purpose of this White Paper
...........................................................................................................
2
OA Failover Process Description
.....................................................................................................
2
OA Failover Testing
–
General Discussion
.......................................................................................
2
OA Failover Testing - Recommendations
..........................................................................................
4
Validate status and allow appropriate recovery time
.....................................................................
4