HP ProLiant SL270s HP ProLiant SL270s Gen8 Server User Guide - Page 42
Installing the FBWC capacitor pack, WARNING, CAUTION
View all HP ProLiant SL270s manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 42 highlights
7. Remove the GPU shelf. 8. Install the cache module in the SAS cache module connector on the system board. For connector locations, see "System board components (on page 9)." 9. Install all components removed from the server. 10. Install the server into the chassis ("Installing the server into the chassis" on page 23). 11. Power up the server (on page 15). Installing the FBWC capacitor pack WARNING: To reduce the risk of personal injury from hot surfaces, allow the drives and the internal system components to cool before touching them. CAUTION: To prevent damage to electrical components, properly ground the server before beginning any installation procedure. Improper grounding can cause ESD. Hardware options installation 42
Hardware options installation 42
7.
Remove the GPU shelf.
8.
Install the cache module in the SAS cache module connector on the system board. For connector
locations, see "System board components (on page
9
)."
9.
Install all components removed from the server.
10.
Install the server into the chassis ("
Installing the server into the chassis
" on page
23
).
11.
Power up the server (on page
15
).
Installing the FBWC capacitor pack
WARNING:
To reduce the risk of personal injury from hot surfaces, allow the drives and the
internal system components to cool before touching them.
CAUTION:
To prevent damage to electrical components, properly ground the server before
beginning any installation procedure. Improper grounding can cause ESD.