HP Scitex FB550 Site Preparation Checklist - Page 4

Checklist

Page 4 highlights

2 Checklist Table 1 Address Information Company Name Street Address City Country Postal Code Telephone Fax Email Table 2 Contact Information Contact Persons Company engineer or technician System administrator Operators to be trained on printer use and maintenance Name Telephone Email Table 3 General Access and Equipment Unloading Item Yes Is there an easily accessible unloading area, with sufficient space to unload and maneuver the equipment?  Has the route to the installation area been checked to meet all requirements (height, width, and clearance of ceilings, doorways,  and corridors) and is the conveyance route clear? Is a power outlet available near the site where you plan to disassemble the crate (for the electric screwdriver used to  disassemble the crate)? Have specialist movers been contracted to unload and move the equipment on the date required?  Are the specialist movers aware of the specifications provided in this document?  Are there one or more suitable forklifts contracted for installation?  Are there skates available to help position the crate?  Is there a pallet jack available to help position the crate?  Will you install the printer on a second level or higher? If so, is there a suitable crane contracted for installation? Are the  appropriate crane attachments available? Will the operator be available for the installation training which lasts two full working days?  No   Comment 4

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8

2
Checklist
Table 1
Address Information
Company Name
Postal Code
Street Address
Telephone
City
Fax
Country
Email
Table 2
Contact Information
Contact Persons
Name
Telephone
Email
Company engineer or technician
System administrator
Operators to be trained on
printer use and maintenance
Table 3
General Access and Equipment Unloading
Item
Yes
No
Comment
Is there an easily accessible unloading area, with sufficient
space to unload and maneuver the equipment?
Has the route to the installation area been checked to meet all
requirements (height, width, and clearance of ceilings, doorways,
and corridors) and is the conveyance route clear?
Is a power outlet available near the site where you
plan to
disassemble the crate (for the electric screwdriver used to
disassemble the crate)?
Have specialist movers been contracted to unload and move the
equipment on the date required?
Are the specialist movers aware of the specifications provided in this
document?
Are there one or more suitable forklifts contracted for
installation?
Are there skates available to help position the crate?
Is there a pallet jack available to help position the crate?
Will you install the printer on a second level or higher? If so, is
there a suitable crane contracted for installation? Are the
appropriate crane attachments available?
Will the operator be available for the installation training which
lasts two full working days?
4