Hitachi DV20VB2 Instruction Manual - Page 10
Assembly And Operation - switch
UPC - 717709008380
View all Hitachi DV20VB2 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 10 highlights
English ASSEMBLY AND OPERATION APPLICATIONS ⅜ By combined actions of ROTATION and IMPACT: Boring holes in hard surfaces (concrete, marble, granite, tiles, etc.) ⅜ By ROTATIONAL action: Boring holes in metal, wood and plastic. PRIOR TO OPERATION 1. Power source Ensure that the power source to be utilized conforms to the power source requirements specified on the product nameplate. 2. Power switch Ensure that the switch is in the OFF position. If the plug is connected to a receptacle while the switch is in the ON position, the power tool will start operating immediately and can cause serious injury. 3. Extension cord When the work area is far away from the power source, use an extension cord of sufficient thickness and rated capacity. The extension cord should be kept as short as practicable. WARNING: Damaged cord must be replaced or repaired. 4. Check the receptacle If the receptacle only loosely accepts the plug, the receptacle must be repaired. Contact a licensed electrician to make appropriate repairs. If such a faulty receptacle is used, it may cause overheating, resulting in a serious hazard. 5. Check your work environment Confirm that the work site is placed under appropriate conditions conforming to prescribed precautions. 10