Hotpoint GSM1860NSS Installation Instructions - Page 7
Installation Instructions
View all Hotpoint GSM1860NSS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 7 highlights
Installation Instructions STEP 2 ADJUST LEVELING LEGS • Move the dishwasher close to the installation location and lay it on its back. Adjust to Installation Height STEP 4 INSTALL POWER CORD Skip this step if dishwasher will be direct wired. The power cord and connections must comply with the National Electrical Code, Section 422 and/or local codes and ordinances. • Recommended power cord length is 54" min. and 64" max. A Remove Junction Box Cover B Check That White, Black and Green Dishwasher Wires Are Threaded Thru Hole in Back Ground White Black Figure H • Measure installation height and dishwasher height. Extend leveling legs out from the dishwasher base, 1/4" less than installation height. STEP 3 REMOVE TOEKICK • Remove the 4 toekick screws. Lift off the 2 piece toekick. Remove 4 Toekick Screws Figure J D Use UL Listed Wire Nuts Figure K C Insert Power • Connect incoming power cord white (or ribbed) to dishwasher white, black Cord Wires Thru Strain Relief and Tighten (or smooth) to black and ground to dishwasher green wire. Use UL listed wire nuts of appropriate size. • Replace junction box cover. Be sure wires are not pinched under the cover. STEP 5 INSTALL 90° ELBOW • Wrap 90° elbow with thread seal tape. • Install a 90° elbow onto the water valve. Fill Hose 90° Elbow Figure L Thread Seal Tape Water Valve Bracket • Do not over tighten 90° elbow, water valve bracket could bend or water valve fitting could break. • Position the end of the elbow to face the rear of the dishwasher. 6