IBM 86473AX User Manual - Page 17

Installation, Getting Started, Installing your LCM

Page 17 highlights

Chapter 2: Installation Chapter 2: Installation 9 Getting Started Before installing your LCM, refer to the lists below to ensure you have all items that shipped with the unit as well as other items necessary for proper installation. Supplied with the LCM • LCM • Power cord • One package of four terminators • One CAT 5 cable, 1.8 meters (6 feet) in length • Rack mounting kit • LCM Installer and User Guide on CD • LCM Quick Installation Guide • One straight-through serial cable Additional items needed • One KCO cable per attached PS/2 server or switch • One UCO cable per attached USB server or switch • One CCO cable per attached IBM C2T server Installing Your LCM Your LCM ships with rack mounting brackets. Before installing the LCM and other components in the rack, stabilize the rack in a permanent location. Install your equipment starting at the bottom of the rack, then work to the top. Avoid uneven loading or overloading of racks.

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60

Chapter 2: Installation
9
Chapter 2: Installation
Getting Started
Before installing your LCM, refer to the lists below to ensure you have all items
that shipped with the unit as well as other items necessary for proper installation.
Supplied with the LCM
LCM
Power cord
One package of four terminators
One CAT 5 cable, 1.8 meters (6 feet) in length
Rack mounting kit
LCM Installer and User Guide on CD
LCM Quick Installation Guide
One straight-through serial cable
Additional items needed
One KCO cable per attached PS/2 server or switch
One UCO cable per attached USB server or switch
One CCO cable per attached IBM C2T server
Installing Your LCM
Your LCM ships with rack mounting brackets. Before installing the LCM and
other components in the rack,
stabilize the rack in a permanent
location.
Install your
equipment starting at the bottom of the
rack, then work to the top.
Avoid
uneven loading or overloading of
racks.